Installation - Mounting the Duct Cover
|
|
|
| www.zephyronline.com | |
MOUNTING THE DUCT COVER |
| ||||
1. Remove the (2) screws to unlock |
| ||||
the top support frame from the |
| ||||
bottom | support | frame. | Fig.1. |
| |
Adjust the height by referring to |
| ||||
the diagram in Fig. 2. Secure the |
| ||||
support frames together with (2) |
| ||||
screws per extension arm (Tot. 8). |
| ||||
Fig.3 |
|
|
|
| |
2. Place correct size ducting for your |
| ||||
installation (not supplied) on top |
| ||||
of hood and secure to the blower | X | ||||
collar with aluminum duct tape. | |||||
| |||||
The ducting should be long enou- | 4,3 - 1/16" | ||||
gh so it protrudes out the top of | C | ||||
the support frame and extends | 24" | ||||
into the attic to connect after the |
| ||||
hood is installed. Fig.4 |
| B | |||
|
|
|
| ||
3. Place assembled support frames |
| ||||
on top of hood and secure it to the | X = C - | ||||
hood body using 8 screws. Fig.5 |
| ||||
4. Place duct covers over assembled |
| ||||
support frame until they rest on |
| ||||
the hood body. Fig.6 |
|
|
|
5.Position hole template on the ceiling paying attention that the arrow is po- sitioned on the same side as the range hood controls. Fig.7
-4 -