ASSEMBLY
CLEVIS PIN 3/8 X 11/16
CLEVIS PIN 3/8 X 2
SUPPORT BRACKET
13/32 FLAT WASHER RETAINER SPRING SUPPORT BRACKET
02813
Fig. 6
DISCHARGE |
CHUTE |
HOOK |
02306 |
BACKPLATE |
SLOT |
Fig. 7
TO ASSEMBLE BAGGER (See Figs. 8-10)
•Unfold bag by pivoting front bagger tube all the way forward and pressing the bottom vinyl binding onto the tube.
5 0290 FRONT BAGGER TUBE
VINYL
BINDING
Fig. 8
•Inside the bag, install spreader bars and retainer springs onto pins on both sides of bag as shown.
•Press the vinyl bindings onto the sides of front bagger tube.
SPREADER BARS
(Inside of bag)
RETAINER SPRING
VINYL BINDING
| 02906 | |
RETAINER | VINYL | |
SPRING | ||
BINDING | ||
|
Fig. 9
•Slide the bagger dump handle through the hole in the bagger top, install the clevis pin 10 x 44mm and secure with retainer clip.
•Push cap over end of bagger dump handle.
NOTE: For future use, the clevis pin may be removed in order to use the handle to clear the chute in the event it has become clogged.
DUMP HANDLE |
TUBE |
CLEVIS PIN |
3/8 X |
RETAINER |
CLIP |
CAP |
02907 |
Fig. 10
BAGGER ADJUSTMENT (See Fig. 11)
For proper bag function and appearance, it may be neces- sary to adjust the bagger assembly. There should be 6mm
HORIZONTAL ADJUSTMENT
•Slightly loosen the nuts securing the bagger RH and LH horizontal adjustment brackets. Loosen only enough so the brackets keep their position, but allow them to be moved.
•Move the brackets the amount forward or backward you wish the bag assembly to move. Retighten the
8nuts securely.