RedMax EXZ2500S-BC manual  26 

Page 26

8. Operation (Optional blade usage EX-BC only)

 

9” 22-tooth:

8” 8-tooth:

8” 4-tooth:

 

CUTTER

SST229

SGB088

SGB048

Nylon line

9” 24-tooth:

9” 8-tooth:

9” 4-tooth:

APPLICATION

head

SST249

SGB089

SGB049

 

CHART

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Under growth

Heavy weeds

Light weeds

Grass

CHOOSE THE BLADE

Choose a suitable recommended cutting attachment according to the object to be cut.

When replacing blade always be sure to use products which have been certified by RedMax.

EX-BC

OP2

(1)

(2)

EX-BC

OP3

WARNING

When sharpening, removing, or reattaching the blade, be sure to wear thick, sturdy gloves and use only proper tools and equipment to prevent injury.

SET UP

1.Detach the line head assembly completely. (OP2)

2.Put on the blade, making the marked side face the holder, put on the outer holders, and fasten the blade with the blade nut. (OP2)

(1)Cover: 3540-13283

(2)Holder: 6019-13250 (Attachment)

IMPORTANT

Change to the debris guard which is suitable for the metal blade. (OP3)

TIGHTENING TORQUE:

130~174 in-lbs (14.7~19.6 N.m.)

26

Image 26
Contents OWNER/OPERATOR Manual T3087-93110Page Safety First ContentsParts location  4 EX-LRT SpecificationsEX-BC EX-PS 6   7  Symbols on the machineType de moteur 1KZXS.0254QR EM Cylindrée du moteur 25,4cc Working Circumstance For safe operationWorking Condition  8 Working Plan  9  10  Before Starting the EngineStarting the Engine Using the Product  11 Handling Fuel MaintenanceIf Someone Comes  12 Transportation  13 Set up Debris guard Plate Screw EX-BC SE1 SE2 Installing Debris GuardInstalling Cutting Head SE2 EX-BC SE3 Balance Unit 16  EX-LRT SE1 Attaching the Trimming Mechanism SE1Main pipe Trimming mechanism Screw hole Fastening bolt EX-PS SE3 EX-PS SE1 Attaching the Pruning Mechanism SE1EX-PS SE2  17 Hole Moving direction Chain tensioner nut Chain tension adjusting screw Loosen TightenEX-PS SE4 EX-PS SE5 EX-PS SE6  18 Bracket EX-HE SE1 EX-HE SE2 EX-HE SE3 EX-HE SE4Clamp bolt Lock screw  19 Recommended Mixing Ratio Gasoline 50OIL HOW to MIX FuelFuel  20  21  Fueling the UnitFor Your Engine LIFE, Avoid Operation  22  23  OP6 OP7 OP8Stopping Engine OP6 OP9 Adjusting Throttle CableAdjusting Idling Speed OP10  24 Trimming Grass and Weeds Adjusting the Line LengthEX-BC OP1 Cutting Work Line Head Usage  25  26  Cutting Method EX-BC OP4 EX-BC OP5 EX-BC OP6Bracket Handle  27 Operation EX-BC OP7 EX-BC OP8 28  Controlling Blade Bounce 29  How you can reduce the chance of kick outHow you can maintain the best control  30  EX-BC OP9 Maintenance BladeTransporting the Unit EX-LRT OP1 Adjusting the Angle of the Cutting Blades OP1Operation EX-LRT only Clamp lever Trimming mechanismEX-PS OP1 EX-PS OP2 Checking OIL Supply Adjusting OIL Flow RateOperation EX-PS only  32  33   34  Operation EX-HE onlyEX-HE OP1  35  MaintenanceMaintenance Chart  36  Spark arrester MA4 MufflerSpark Arrester Intake AIR Cooling VentMA6 Procedures to be Performed After Every 100 Hours of USEMA51 Cylinder Intake air cooling vent backGear Case MA5 Maintenance EX-BC onlyFor safety reasons, do not use metalreinforced line  39 Blades MA1 EX-LRT MA1 EX-LRT MA2 40  Quick TIPGuide BAR Maintenance EX-PS onlyEX-PS MA1 MA2 MA3 Oiling Port  41 Sprocket EX-PS MA4 MA5 MA6 42  SAW ChainEX-PS MA7 MA8 MA9  43  44  Maintenance EX-HE onlyMA1 Gear Case Storage  45  46  Troubleshooting guideCheck Probable Causes Action Parts list EX-LRT ATT EX-PS ATT EX-HE ATTEXZ-PU S/N 302845 and up  48  49  EX-BC S/N 302960 and up  50  51  Engine Unit 352001 and up  52  53  Description Part Number QtyEX-LRT S/N 000531 and up  54  55  Casing BEX-PS S/N 000000 and up  56  57  EX-HE S/N 000101 and up  58  59  Manufacturer’s warranty coverage RedMax 2-YEAR Limited Warranty RedMax Garantie limitée à 2 ans Page Komatsu Zenoah America INC