PYLE Audio BSV750 Assembly, Remove Generator from Carton, Grounding the Generator

Page 10

ASSEMBLY

Read this manual. Do not attempt to operate equipment until you have read this Manual for Safety, Operation, and Maintenance Instruc- tions.

NOTE: This manual is a general manual. Informa- tion in this manual may or may not pertain to your model. Please read carefully.

NOTE: Left and right describes the location of a part with the operator facing the outlet panel.

REMOVE GENERATOR FROM CARTON

Open carton from top.

Cut carton along dotted lines.

Remove all carton inserts.

Remove generator through opening in carton.

(If equipped) See portability Kit instructions to assemble the portability kit.

(if equipped) Remove

shipping block from

 

 

under the gen head by

 

unscrewing the bolt and

 

remove the wood

 

 

block. It is very

 

 

important that this is

Figure 1

removed before starting your

 

generator. See

Figure 1.

 

IMPORTANT: Before any attempt to start your genera- tor be sure to check engine oil (See Engine Operator's manual)

GROUNDING THE GENERATOR

A grounding lug is supplied with the generator for use when required by local electrical ordinances. Refer to article 250 of the National Electrical Code to clarify any needed grounding information. Your local electric com- pany or a certified electrician should be able to help you with this information.

NOTE: Your engine is already grounded to the frame by a grounding strap.

Grounding Lug

Figure 2

TYPICAL INSTALLATION OF BATTERY

Recommended Battery for Electric

Start: 12V - 45 A H. or 210 CCA (Cold Cranking Amps)

Purchase battery and battery hardware separately, not included with unit.

1.Place battery in rack with terminals facing towards generator head.

2.Place battery bracket (A) over battery as shown in Figure 3 (opposite battery terminals).

Figure 3

3.Place "L" bolt (B) through top and bottom brackets and secure with wing nut (C).

4.Locate the solenoid on the left side of the unit. See Figure 4.

Nut Positive (+)

Battery Cable

Solenoid

Figure 4

To Prevent sparks connect the red (positive) cable to the positive (+) terminal before connecting the black negative cable.

5.Remove the nut from the solenoid post and place one end of the positive (red) battery cable onto the post. Reassemble nut and tighten securely. See Figure 4.

10 — ENG

Image 10
Contents Generator Specification ModelWarranty This Warranty is not Transferable and does not CoverHazard What could Happen HOW to Prevent IT Safety Guidelines DefinitionsRisk of Electrocution and Fire Risk of Electrocution and Fire cont’d Indoors ANY Risk of FireOr wall. do not Operate Unit Confined AreaRisk of Breathing Inhalation Hazard Risk of Unsafe Operation Risk of HOT SurfacesRisk from Lifting Risk of Moving PartsRisk of BURN-EXPLOSION Hazard Remove Generator from Carton AssemblyGrounding the Generator Transfer Switch, a minimum of 10 gauge wiring must be used Extension Cord Wire Gauge Chart LengthObtaining Electricity from the Generator Operation To Start the Engine For Recoil StartPlace OFF/RUN/START switchBefore Start UP Follow the steps listed below before starting gener- atorConnecting Electrical Loads Stopping EngineMaintenance Storage Engine PreparationDetermining Wattage Requirements Wattage CalculationsRunning Watts Starting Watts Starting Wattage Requirements Volts X Amp = Watts Volts x 10 amps = 1200 wattsHousehold Wattage Calculator Appliance or Load Device Typical Device Wattage TotalTroubleshooting Guide ENG Wattage Wiring Battery Volt REG Engine Storage Operation Always Refer to the Manuals Supplied with this Unit