Snapper EZF6100M, EZF2100DKU, EZF2300GKU, EZF5200M, EZF2100DKU, EZF2300GKU, EZF5200M, EZF6100M

Page 25

Section 4 - ADJUSTMENTS & REPAIR

4.8 MOWER SPINDLES (Field Serviceable Spindles) BEARING REPLACEMENT

In the event that a spindle bearing requires replacement, the SNAPPER Field Serviceable Spindles have been designed so that no special tools or presses are required.

1.Remove belt. Loosen blade nut and remove. Allow blade bolt, washer, blade and four spacers to drop down out of the spindle housing. See Figure

REMOVE NUT

REMOVE BELT

 

FROM SPINDLE

 

 

REMOVE BLADE

BOLT

FIGURE 4.11

2.Remove spindle pulley from spindle shaft.

3.Locate circular retaining ring on spindle shaft at top bearing. Remove retaining ring. Allow spindle shaft to drop out of housing.

4.Top and bottom bearings are now removable. Pull out on inner race to slide bearing from housing. See Figure 4.12.

 

 

 

PULLEY

 

 

 

 

 

 

BEARING

 

 

 

RETAINING RING

SEAL UP

 

 

 

 

 

 

 

 

BEARING

 

 

 

 

 

SPINDLE

 

 

 

 

 

HOUSING

 

 

 

 

 

INNER RACE

 

 

 

 

 

 

 

 

 

 

BEARING

 

 

 

BEARING SEAL

 

 

 

DOWN

 

 

 

 

 

SPINDLE

 

 

 

 

 

 

 

 

 

 

 

 

SHAFT

 

 

 

 

NOTE: The bearing is sealed/shielded on one side only. The bottom bearing must be installed with the sealed/shielded side DOWN.

7.Insert spindle shaft up through the bottom bearing. Slide spacer down over spindle shaft.

8.Install new top bearing. Install the top bearing with the seal/shield UP.

9.Slide circular retaining ring down spindle shaft until it fully locks into groove on shaft.

10.Place spindle pulley and spacer on top of spindle shaft.

11.Reinstall blade bolt, washer, blade and four spacers.

12.Torque blade bolt and nut to 60 to 75 ft. lbs.

IMPORTANT: Spindle housing must be filled with grease before operating mower. Failure to fill housing will cause premature bearing failure.

13.Pump grease into spindle housing until grease purges from vent on housing.

14.After the first 5 hours of operation, grease spindle housing to insure it is full, then every 25 hours.

FIGURE 4.12

5.Thoroughly clean all parts removing all old contaminated grease.

6.Install new bottom bearing first.

25

Image 25
Contents Instruction No -4370 I.R /6/01 Model Number ExplanationProtection Against Tipovers Protection for ChildrenPreparation Operation MaintenanceMount and dismount machine from left side Table of Contents Nomenclature IntroductionEngine Stop OFF RUN on Start Glow Plug PRE-HEAT SymbolsDiesel Fuel only Symbols PRE-START Check List Operating InstructionsStarting & Stopping ENGINE, Blades & Parking Brake Starting EngineStopping Engine Starting Engine from previousEngine Starting Mower BladesParking Brake Cutting Height AdjustmentOperation Motion Control Driving Machine Change Engine OIL Service After First 5 HoursCheck Mower Blade After Every 25 Operating Hours Check Mower Drive BeltMower Components Other Lubrication Points Riding Mower LubricationBefore Operating Mower From previous Annually END of Each SeasonFuel Filter Diesel Engine only Deck RemovalPower Transfer Shaft Removal Neutral Position Adjustments Adjustments & RepairParking Brake Adjustment Blade Wear Limits from previous Mower Blade ReplacementBlade Sharpening Mower Drive Belt Replacement Mower Drive BELT, Engine Belt & Hydro Pump Belt ReplacementMower Drive Belt Removal Engine Belt RemovalBattery Installation Battery Battery RemovalBattery Service On NextBattery Testing BatteryNEW Battery Preparation Do not OverfillRemove NUT Remove Belt From Spindle Remove Blade Bolt Problem Probable Cause Corrective Action TroubleshootingProblem Probable Cause Corrective Action MAINTENANCE/REPLACEMENT Parts Service ScheduleDisclaimer of Warranty Year Limited WarrantyPage Page OUT Front Z-RIDER Hydro Drive Series