Bag, Chute and Tube Installation
Bag, Chute and Tube Installation
INSTALL COLLECTOR BAGS
1.Raise the cover (A, Figure 12).
2.Slide collector bags (B) onto tubes (C) with the white bar towards the rear.
Note: It may be necessary to fold seat forward to allow cover to stay in the raised position.
A
C |
B |
LOWER DISCHARGE CHUTE INSTALLATION
1.Lift discharge deflector up (E, Figure 13).
2.Place the front hole of the lower chute (A) onto carriage bolt (C) as shown. Slide front edge of lower chute (A) under hinge bracket (G).
3.Place the rear hole of the lower chute (A) onto carriage bolt (F) as shown.
4.Secure knob (B) onto carriage bolt (C) as shown.
5.Secure wing nut (D) onto carriage bolt (F) as shown.
Figure 12. Install Collector Bags
A.Cover
B.Collector Bags
C.Tubes
E |
A |
D |
F |
G |
B |
C |
Figure 13. Install Lower Discharge Chute
A.Lower Chute
B.Knob, 5/16-18
C.Front Carriage Bolt, 5/16-18 x 3/4
D.Wing Nut, 5/16
E.Discharge Deflector
F.Rear Carriage Bolt, 5/16-18 x 3/4
G.Hinge Bracket
8