13.Install the new baffle (A, figure 8) in deck on stone guard using existing hardware. Hardware may be installed with nut to inside or nut to outside.
H&k 8&fle
Over Stone Guard 6
‘igure 8.
a Baffle
s. Carriage Bolt
C. Mower Discharge Opening
14.On new arbor cover, install on top of weld bolt (A, figure 9) the largest washer (B
spacer (C), lo&washer(D), and nut (Q as shown in
figures. (Largeflatwasher(F) shownwillbeinstalled in next step).
15.On 2-l/2” idler cover bolt, install beit cover to deck reusing front taptite screw (G) removed in step 1. Install flat washer (I) and flange nut (J, removed in step 4) to secure belt cover. Tighten flat washer and flange nut (H) loosened in step 1.
Figure 9 .
A. Weld Bolt
8. Large Washer, I-112” O.D.
C. Spacer, 112”
D. Lockwasher
E. Nut
F. Large Washer
0. Taptite Screw
H. Center Hardware
I. Flat Washer
J. Flange Nut
1 1