12.Install wing nut (D, figure 9) as follows:
a. Remove existing hardware from front end of stone guard.
b.Frominsidedeck,installnew
c.Threadthewingnut(D)farenoughontothe screw so that the 5/16 locknut (E) can be threaded on flush with the end of screw.
Figu’ie | 9. |
|
|
A. cup |
| Q. Wing Nut |
|
q . Lockwasher, 5116 | E. Lrxknut, | 5116 | |
C. Nut. | 5116 | F. Carriase | Bolt |
13.Install the new baffle (A, figure 10) in deck on stone guard using existing hardware. Hardware may be installed with nut to inside or nut to outside.
Figure 10.
A. Battle
B. Carriage Bolt
C. Mower Discharge Omening
14.Install the blower assembly as follows:
a. Pivot cover (B, figure 8) away to expose the arbor.
b.Alignthenotch(G,figure11)with spaceron arbor bracket. Align spacer(C) with notch (C, figure 2) on arbor bracket. Slide theassembly into place as shown in figure 13, while aligning front notch between cup and wing nut (D, figure 13). Tighten wing nut.
Figure 11.
A. Blower Drive Belt
B. Idler Pulley C. Space
D. Belt Retainer
E. Baffle
F. Driven Pulley
G. Notch
Hdok B&e
Over Stone Guard 6
6