Zenoah BCZ2610DL owner manual Set up

Page 8

BCZ2610DL

6. Set up

SUSPENSION POINT

SUSPENSION POINT

NOTE

 

Be the SUSPENSION POINT in the location of the arrow mark.

arrow mark

INSTALLING HANDLE

NOTE

The handle is put during the arrow mark.

• Mount the handle to

SPACING

MIN

the shaft tube and

 

suspension point it

 

at a location that is

About 48 cm

comfortable to you.

HARNESS

WARNING

ALWAYS WEAR THE PROVIDED HARNESS WHEN USING THE MACHINE!

Always make sure the machine is hooked securely to the harness.

If you don't, you will be unable to control the machine safely. This can result in injury to yourself or others. Never use a harness with a defective quick release or any other damage.

HOW TO WEAR

1.Wear the provided harness without twisted bands, with the hanger on your right side.

INSTALLING CUTTING ATTACHMENT GUARD FOR LINE HEAD

• Attach the cutting attachment guard with the bolts provided while inserting the spacer between the guard and the pipe.

INSTALLING LINE HEAD

1.While locking the gear shaft by inserting the angled bar(1) into the holder(A)(2) on the angle transmission, loosen and remove the nut (left-handed).

2.Fit the line head assembly to the gear shaft. Tighten it securely by hand.

INSTALLING CUTTING ATTACHMENT GUARD FOR METAL BLADE

When using metal blade, make sure to remove the guard skirt.

BLADE

1.Put the angled bar(1) into the side holes of the holder(A)(2) and the angle transmission.

2.Remove the nut (left-handed) and the holder(B)(3) from the gear shaft.

3.Put the blade onto the holder(A)(2). Make the marked side face the holder.

4.Put the holder(B)(3) onto the gear shaft making the recessed side face the blade.

5.Fasten the blade by the nut and the cover(4).

(1) Hanger

(1)

BALANCE THE UNIT

1.Hook your machine to the hanger.

2.Adjust the bands of the harness to have the blade parallel to the ground when standing in your normal working position to provide you most effectiveness and comfort on operating the machine.

3.In order to prevent the hanger position to change during operation, turn up the extra part of the band from the buckle.

4.When correctly adjusted, check the correct working of the harnesses'

QUICK RELEASE.

QUICK RELEASE

The harness is equipped with a "QUICK RELEASE"devise. To release the machine from the harness in emergency situations, please follow the procedure as explained below.

WARNING

Make sure to check proper working of the QUICK RE- LEASE device BEFORE operating the machine. Make sure to hold the unit securely when using the

QUICK RELEASE.

While holding the unit by your right hand securely, press both sides of the buckle. sides of the buckle.

(1) Buckle

(1)

GB-8

Image 8
Contents BCZ2610DL E13*97/68SH2G3*2002/88*0404*00 1st JanuaryWear head, eye and ear protection Contents Parts locationNever modify your machine SpecificationSymbols on the machine For safe operation Working ConditionWorking Circumstance Working PlanStarting the Engine Using the ProductBefore Starting Engine Maintenance If Someone ComesHandling Fuel TransportationSet up Fuel Stop Start Stop switch OperationStarting Engine Cutting head will start rotating upon the engine startsAdjusting Throttle Cable Adjusting Idling SpeedCutter Application Chart Metal Blade UsageAdjusting the Line Length Cutting MethodControlling Blade Bounce Cutting Work Line Head UsageMaintenance Maintenance ChartFor safety reasons, do not use metalreinforced line PointReplacement Plug is a NGK CMR7H AIR FilterFuel Filter Spark PlugDisposal Procedures to be Performed After Every 100 Hours of USEStorage Check Probable Causes Action Troubleshooting guideLimited warranty