6. Set up
INSTALLING HANDLE | INSTALLING CUTTING HEAD |
• Install the handle to the shaft tube and clamp.
INSTALLING DEBRIS GUARD
•Attach the guard to the bracket on the main pipe and fix it with 2 screws.
G |
B |
1.While locking the gear shaft, by inserting the supplied tool into the upper holder on the gearbox, loosen and remove the hexagon nut
2.Then screw in the cutting head to the gear shaft over the holders.
BALANCE UNIT
1.Put on strap and attach unit to strap.
2.Slide clamp up or down until unit balances with head aparting from the ground when using it.