Zenoah BC2002, TR2001 Set up, Installing Handle Installing Cutting Head, Installing Debris Guard

Page 9

6. Set up

INSTALLING HANDLE

INSTALLING CUTTING HEAD

• Install the handle to the shaft tube and clamp.

INSTALLING DEBRIS GUARD

Attach the guard to the bracket on the main pipe and fix it with 2 screws.

G

B

1.While locking the gear shaft, by inserting the supplied tool into the upper holder on the gearbox, loosen and remove the hexagon nut (left-handed).

2.Then screw in the cutting head to the gear shaft over the holders. Hand-tighten it securely.

BALANCE UNIT

1.Put on strap and attach unit to strap.

2.Slide clamp up or down until unit balances with head aparting from the ground when using it.

GB-9

Image 9 Contents
BC2002 TR2001 Explanation of Symbols and Safety Warnings Contents Parts location SpecificationNever modify your machine Symbols on the machineWorking Condition For safe operationWorking Circumstance Working PlanUsing the Product Before Starting EngineStarting the Engine If Someone Comes MaintenanceHandling Fuel TransportationInstalling Handle Installing Cutting Head Set upInstalling Debris Guard Balance UnitFuel Operation Starting EngineStopping Engine Adjusting Idling Speed Adjusting Throttle CableAdjusting the Line Length Cutting Work Line Head UsageMaintenance AIR FilterFuel Filter Spark Plug Replacement Plug is a NGK BPMR7AMuffler Gear CaseProcedures to be Performed After Every 100 Hours of USE StorageRefilling Trimming Line Troubleshooting guide Limited warrantyCheck Probable Causes Action