Pentair Side Pool Cleaner installation manual Pool Connections, Booster Pump Installation

Page 6

II. Installation Instructions

A. Legend® Platinum Components

The Legend® Platinum Box Contains:

1.Cleaner Head

2.Sand & Silt Bag

3.Sweep Hose

4.Complete Feed Hose

a.1 - 8½ in. hose

b.2 - 10 ft. long hoses

c.1 - 30 in. soft hose/1 - 7½ ft. soft hose

d.10 - Floats

e.3 - Swivels

f.1- Back-Up Valve

g.10 - Mender Nuts

h.1 - Wall Fitting complete

B. Pool Connections

The Legend® Platinum comes equipped to connect to a female threaded 1-1/2 in. line, dedicated to our Universal Booster Pump.

Also, if the pool doesn't have a dedicated cleaner line please contact our Technical Support Department at 1-800-831-7133.

C. Booster Pump Installation

If you already have a 3/4 horsepower booster pump installed at your equipment pad and it is operational, skip this section and proceed to Installing the Twist Lock Pressure Relief Valve (Wall Fitting).

Detailed booster pump installation instructions are packaged separately in our booster pump box. Please follow these instructions carefully.

The booster pump is not self-priming and needs to be fed with water taken from the pool filter before any type of in-line chlorinator. See figure below.

2

LEGEND® PLATINUM INSTALLATION MANUAL

Image 6
Contents Installation Guide Customer Service Web siteLL105PMTGG / LL105PMTWW LL105PMTRW / LL105PMTYW Important InformationTable of Contents Thank You for Choosing the Legend Platinum Pool Cleaner What to Expect from the Legend PlatinumBooster Pump Installation Pool ConnectionsInstalling the Twist Lock Pressure Relief Valve Wall Fitting Cutting the Feed HoseExample of Hose Assembly Before Cutting to Length Step Feed Hose Sweep Hose Adjustment Fine Tuning the Legend PlatinumThrust Jet Adjustment Checking OperationChecking Wheel RPM Connecting/Disconnecting the Legend Platinum Periodic MaintenanceWall Fitting Screen Accessories Back Washing the Pool FilterStorage and Winterizing IV. Troubleshooting and Performance Tips Problems & Solutions Diagram # Description Quantity Diagram # First Second Hose 31/06 P/N Yyplatinstall REV. C