Generac 20kW owner manual Level

Page 21

Standby Generator Sets

Service Schedule

Maintenance

Level 1

 

Level 2

 

Level 3

 

Level 4

 

Tasks

Recom-

Task

Required

Task

Required

Task

 

Task

 

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

 

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

 

monthly

Initials)

Break-in

Initials)

annually

Initials)

Annually

Initials)

1. Disable the unit from operating per the first page warning.

2.Check the engine oil level. Adjust as necessary.

3.Check the engine coolant level. Adjust as necessary.

4.Check the engine coolant

thermal protection level. Correct as necessary.

5.Check the natural gas delivery system on gas

engine driven units. Tighten connections as necessary.

6. Check the air inlets and outlets for debris. Clean as necessary.

7.Check the battery electrolyte level if accessible. Adjust as necessary.

8.Check the battery posts,

cables, and charger for loose connections, corrosion, and proper operation. Correct as necessary.

9.Check the unit wiring for loose connections, corrosion, and damage. Correct as necessary.

10.Check the engine

accessory drive belts for wear, weather cracking, and damage. Replace as necessary.

11.Visually inspect the unit looking for leaks, wear or damage, loose connections or components, and corrosion. Correct as necessary.

12.Test the engine and transfer switch safety

devices. Correct and/or adjust as necessary.

09/05 A .Rev SrvSchd002

11-2

Image 21
Contents Centurion Standby Generator Sets Table of Contents  Warning   Electrical Hazards  ‹ HOW to Obtain Service ‹ Operation and MaintenanceAuthorized Service Dealer Location IntroductionIdentification Record Generac Power SYSTEMS, INCGenerator SET Data ‹ Data LabelEquipment Description Engine OIL RecommendationsCoolant Recommendations Engine Protective Devices ‹ Fuel Requirements Fuel System‹ Natural GAS Fuel System ‹ LP Fuel SystemSpecifications ‹ Cold Weather KIT ‹ Reconfiguring the Fuel System‹ FOUR-LEAD, SINGLE-PHASE Stator Alternator Power Winding Connections‹ 3-PHASE Alternators Generator AC Lead ConnectionsInstallation Preparation Before START-UPInitial Inspection for QT Genset Startup START-UP Checklist ‹ Preparation for START-UP‹ START-UP Inspection Generator Control Operation Operating Unit with Manual Transfer Switch‹ Engine START-UP and Transfer ‹ Retransfer and ShutdownChecking Fluid Levels Cooling SystemMaintenance Owner Operator can Perform ‹ Changing the Engine AIR Cleaner ‹ Coolant Change ‹ Changing Engine OIL‹ Spark Plugs Miscellaneous Maintenance Service Maintenance Interval Information Service ScheduleLevel Maintenance Level Problem Cause Correction Troubleshooting GuideStandby Generator Sets Standby Generator Sets Page Breaker Tray BACK/BOTTOM Page Assy Rotor 20KW Page Battery Tray C1 CPL Page Mounting Base 1.5L C1 CPL Page Support Radiator LH Side Page ASM Motor Stepper Page ENGINE-1.5L Page Elbow 90D 3/4 NPT Page Roof C1 CPL Page Muffler C1 Page Page Page Page Page Page Standby Generator Sets Warranty