Subaru Robin Power Products DY35, DY41, DY30 manual Circulation

Page 42

7-6ELECTRICAPPARATUS (ElectricStarter)

1.Wiringdiagram

KEYSWITCH

GENERATOR

ELECTRIC STARTE

1) Circulation

12V35AH

When starting by the electric starter, (Keyis at the position of start.)

Battery (+)-+BAT of key + ST of key + Starter + Battery (-)(earth)

Charging, operating (Key is at the position of operation.)

Generator "f Rectifier + IC of key +. BAT of key +. Battery (+)

2.Lead wire for electricstarter

When mounting the engine, location of the battery may comes into question, but setleadthe wire followingmethod:

BATTERYSTARTERELECTRICStDETERMINAL

SIDE TERMINAL

JIS BA-508

JIS BA-508

3.Earth band Plain woven lead wire sectional area 20 mm2 and up.

I"

Approx. 25

L

Fasten tightly to the place made of metal and not paint coated. Theplace must be electrically conducted completely to the crankcase of the engine.

4, Other remarks

1)All lead wires are classified by coloring, so when connecting, select and connect by color. Meantime, insert the connectors each other uptill the roots.

2)The wire from (+)terminal of the battery must be connected t o (+)terminal of the electric starter, and thewire from the (-)terminal must be connected to the earthof the engme body.

3)Select the wire from the below Table A, based on the required length of the wire.

4)When thekey switch is setapartfromthe engine body, select the wire from belowTable B, based on the required

length of the wire between the key switch and the magnetic switchon the side of engine.

 

I

Outside dia.

 

 

Outside dia.

Length

Description

Length.

Description

1.5 m or shorter

AV15

7.3 mm

1.5 m or shorter

A V 1 -25

1.5 mm

m -2.5 m

AV20 1.5

8.5mm

'i.5m-31-17

A V 2

1.9 mm

2.5 m -3m

AV30

10.8 mm

3 m" 5 m

A V 3

1.4 mm

Table

Table A

-39

-

B

 

 

 

 

 

I-

,"-

Image 42
Contents Page EY45V Crankshaft ? m Page Performance Model DY35DtB Generaldescription of ENGlME Construction 2 Cylinderhead 8ROCKER ARM 1 TappetRocker Cower F Lubrication SystemCooling System Combustion System Sectional View of Engine \ \ Disassembly and Reassembly Special Tools3DISASSEMBLING Sequence PcsSe- Item quence L2L Procedures Oil pump Remarks Bolts, nuts etc. used Snap ring Remove the snap ring Be sure not to miss 22 7T bolt pcs 12 bolt pcs Install the flywheel 5 7T bolt, . . . , pcs Mm nut pcs T round 10 x 30 bolt pcs Mm nut . . . . . . . . . . . . . . .2 pcs Fuel Quality Of FuelGeneral Description of Auxiliary Gadgets and Parts Fuel Injection Pump MechanismRelation between the plunger and the rack Injectiontiming andeffectivestarting 51 kg/mm Fuel InjectionpumpNozzle Holder Fuel Injection Nozzle HolderPush further and check whether or not the fuel fog Body of nozzle with your fingers and then let 3GOVERNORMECHANISM and Operation Mechanism Operation $=I OIL FilterCirculation Installation Checks and Corrections Tables of Correction Standards Itemstandard005 Description 36.5Maintenance and Storing Checks and maintenance Reasons for requiring them 12 /2 Reducer M8 x Structure Of 1/2 Reducer 12-2-1INPUTSHAFT 12 3 1 Disassembly Sequence Sws12-5 Page Shaft Page Industrial Engines