ASSEMBLY / PRE-OPERATION
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
1.Retrieve vinyl sleeve and spring from bag of parts and retrieve the auger control rod from carton chute tray. Slide straight rod end through the small hole in the vinyl sleeve. Hook spring in hole in rod end.
2.Hook end of spring into control arm with loop opening up as shown. (See Fig. 5)
3.With top end of rod positioned under right side of control panel, push down on rod and insert end of rod into hole in auger control bracket. Secure with retainer spring.
AUGER |
CONTROL |
ROD |
VINYL |
SLEEVE |
CONTROL |
ARM |
LOOP |
OPENING |
UP |
Fig. 5
AUGER CONTROL ROD | AUGER | |
RETAINER | CONTROL | |
LEVER | ||
SPRING | ||
| ||
| AUGER | |
CONTROL | ||
BRACKET |
Fig. 6
INSTALL DISCHARGE CHUTE / CHUTE ROTATOR HEAD (See Fig. 7)
NOTE: The
1.Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower.
2.Position chute rotator head over chute bracket. If neces- sary, rotate chute assembly to align square and pin on un- derside of chute rotator head with holes in chute bracket.
3.With chute rotator head and chute bracket aligned, position chute rotator head on pin and threaded stud of mounting bracket.
4.Install 3/8 washer and locknut on threaded stud and tighten securely.
CHUTE |
|
|
ROTATOR |
| 3/8 LOCKNUT |
HEAD |
|
|
|
| 3/8 WASHER |
|
| PIN |
|
| THREADED |
|
| STUD |
| ALIGN BEFORE | ROTATOR HEAD |
CHUTE | MOUNTING | |
BRACKET | TIGHTENING LOCKNUT | BRACKET |
Fig. 7
6