NEC
EXPRESS800
manual
Introduction
Install
Connecting the Console Monitor
Configuration Guidelines
Accessing Door Handles
Leveling Foot Adjustment
Weight
System Rack Placement
Safety
Power Distribution Unit PDU
Using This Guide
Page 11
1
Introduction
!
Introduction
!
System Rack Models
!
Configurator Assistant
!
42U System Rack
!
Multi-Bay
System Rack
Page 10
Page 12
Image 11
Page 10
Page 12
Contents
EXPRESS5800/System Rack
Page
EXPRESS5800/System Rack
Proprietary Notice and Liability Disclaimer
Contents
Iv Contents
Installing Rack Components
Using This Guide
Using This Guide
Related Documents
Vi Using This Guide
Text Conventions
Safety Notices for Users Outside of the U.S.A. and Canada
Safety Notices
Care and Handling
Viii Using This Guide
Introduction
Introduction
Express5800 Configuration Assistant
Introduction
System Rack Models
Typical 42U System Rack Enclosure Introduction
42U System Rack
Component Description
Typical System Rack Components
Multi-Bay System Rack Introduction
Multi-Bay System Rack
Page
Planning Your Site
Planning Your Site
Equipment Location
Space Requirements
System Rack Space Requirements Planning Your Site
Environmental Conditions
Total
Equipment Weight
Floor Construction
Planning Your Site
System Rack Placement
Distance Between Stabilizer Anchors
Cooling Capacity
Temperature and Humidity Requirements
Air Conditioning
Electrical Facilities
Uninterruptible Power Source UPS
Power Distribution Unit PDU
Component BTU/hr Times Number Equals Installed
Grounding Requirements
Page
Planning Your System Rack Configuration
Cable Summary
Planning Your System Rack Configuration
Cabling Constraints
Cable Summary
Concentrator Cable Lengths
Vertical Spacing
RAID Cable Restrictions
Page
Rack Components Space Requirements Approximate
Vertical Space Requirements
Configuration Guidelines
Inches Component
System Rack Configuration Worksheet
Calculating Load and Determining UPS On-Battery Run Time
Times Number Component Voltage Amps# Systems Load Installed
Determining the Load on a Single Power Source
Total Load Run Time Minutes
Total Load Versus On-Battery Run Time
Installing the System Rack
What You Need
Installing the System Rack
Unpacking the System Rack and Components
Rack Mounted on Shipping Pallet Installing the System Rack
Opening Front and Rear Doors
Accessing Door Handles
Removing Rack Side Panels
Removing the Side Panels Installing the System Rack
Leveling the System Rack
Leveling Foot Adjustment
Multi-Bayed Rack System
Installing Rack Frame Link Kits
Rack Frame Link Kit Installation Installing the System Rack
Attaching the Front Stabilizers
Attaching the Stabilizer to the System Rack
Installing Rack Components
Inch System Rack
Typical Configuration
Installing Rack Components
Tools Required
Installing Rack Components
Recommendations and Warnings
Installing the UPS
Refer to
UPS
Installing the Interface Expander Accessory
Installing the UPS
Mounting UPS L-Channel Supports
Location of UPS Rear Panel Components
Connecting Your Master and Protected servers BSUs
Page
Installing a Power Distribution Unit
10. Securing the Keyboard Tray Installing Rack Components
Installing a Keyboard Tray
Installing the Concentrator
11. Assembling the Concentrator Rails
Install the supporting cage-nuts in the rail. See Figure
13. Installing a 1U Filler Panel Installing Rack Components
Installing Blank Panels
14. Monitor Tray and Mounting Hardware
Installing a Monitor Tray
Connecting Servers BSUs to the Concentrator
Connecting the Console Monitor
Page
Illustrated Parts Breakdown
Field Replaceable Unit Locations Illustrated Parts Breakdown
Field Replaceable Units
Field Replaceable Units
Rack Frame Link
Part Number Description
Options
Options
Page
Index-1
Index
Page
Page
456-01544-000
Top
Page
Image
Contents