Connecting the Console Monitor

Perform the following steps to connect the console monitor to the concentrator.

1.The keyboard, mouse, and video display cables attach to the first group of connectors on the left of the concentrator when viewed from the rear. See Figure 5-15.

2.The top-most connector is for the monitor (Figure 5-15, A). Below the monitor connector, connect the keyboard to the keyboard connector (K) and connect the mouse to the mouse connector (M).

Note: If necessary, you can use 12-ft extension cables to achieve overall cable lengths of 19-ft or 24-ft to accommodate the placement of your console monitor on external desktop.

One

Two

Three

Four

Five

Six

Seven

Eight

A

One

Reset

K MK M

Figure 5-15. Connecting Cables to the Port Concentrator

Connecting Servers (BSUs) to the Concentrator

1.Connect the keyboard, mouse, and video display cable from each server to one of the concentrator connector groups labeled one through eight. See Figure 5-15.

2.Attach the AC power cord to the receptacle located next to the power on/off switch on the right side of the concentrator when viewed from the rear. Connect the other end of this power cord to the PDU or UPS.

Installing Rack Components 5-19

Image 67
Contents EXPRESS5800/System Rack Page EXPRESS5800/System Rack Proprietary Notice and Liability Disclaimer Contents Iv Contents Installing Rack ComponentsUsing This Guide Using This GuideText Conventions Vi Using This GuideRelated Documents Safety Notices for Users Outside of the U.S.A. and Canada Safety NoticesCare and Handling Viii Using This GuideIntroduction Introduction Express5800 Configuration AssistantIntroduction System Rack ModelsTypical 42U System Rack Enclosure Introduction 42U System RackComponent Description Typical System Rack ComponentsMulti-Bay System Rack Introduction Multi-Bay System RackPage Planning Your Site Space Requirements Equipment LocationPlanning Your Site System Rack Space Requirements Planning Your Site Environmental Conditions Floor Construction Equipment WeightTotal Planning Your Site System Rack Placement Distance Between Stabilizer Anchors Air Conditioning Temperature and Humidity RequirementsCooling Capacity Electrical Facilities Uninterruptible Power Source UPSPower Distribution Unit PDU Component BTU/hr Times Number Equals InstalledGrounding Requirements Page Planning Your System Rack Configuration Cable Summary Planning Your System Rack ConfigurationCabling Constraints Cable SummaryRAID Cable Restrictions Vertical SpacingConcentrator Cable Lengths Page Rack Components Space Requirements Approximate Vertical Space RequirementsConfiguration Guidelines Inches Component System Rack Configuration WorksheetCalculating Load and Determining UPS On-Battery Run Time Times Number Component Voltage Amps# Systems Load Installed Determining the Load on a Single Power SourceTotal Load Run Time Minutes Total Load Versus On-Battery Run TimeInstalling the System Rack What You Need Installing the System RackUnpacking the System Rack and Components Rack Mounted on Shipping Pallet Installing the System Rack Opening Front and Rear Doors Accessing Door HandlesRemoving Rack Side Panels Removing the Side Panels Installing the System RackLeveling the System Rack Leveling Foot AdjustmentMulti-Bayed Rack System Installing Rack Frame Link KitsRack Frame Link Kit Installation Installing the System Rack Attaching the Front Stabilizers Attaching the Stabilizer to the System RackInstalling Rack Components Installing Rack Components Typical ConfigurationInch System Rack Tools Required Installing Rack ComponentsRecommendations and Warnings Installing the UPSRefer to UPSInstalling the Interface Expander Accessory Installing the UPS Mounting UPS L-Channel Supports Location of UPS Rear Panel Components Connecting Your Master and Protected servers BSUs Page Installing a Power Distribution Unit 10. Securing the Keyboard Tray Installing Rack Components Installing a Keyboard TrayInstalling the Concentrator 11. Assembling the Concentrator Rails Install the supporting cage-nuts in the rail. See Figure 13. Installing a 1U Filler Panel Installing Rack Components Installing Blank Panels14. Monitor Tray and Mounting Hardware Installing a Monitor TrayConnecting Servers BSUs to the Concentrator Connecting the Console MonitorPage Illustrated Parts Breakdown Field Replaceable Unit Locations Illustrated Parts Breakdown Field Replaceable Units Field Replaceable UnitsRack Frame Link Options OptionsPart Number Description Page Index-1 IndexPage Page 456-01544-000