NEC EXPRESS800 manual Index-1

Page 75

Index

A

Air Conditioning, 2-9 cooling capacity, 2-9

B

Blank Panels installing, 5-17

C

Cable Restrictions

RAID, 3-3

Cable Summary, 3-2

Cabling Constraints, 3-2

Concentrator

installing, 5-14

Concentrator Cable Lengths, 3-3

Configuration Assistant, 1-2

E

Electrical Facilities, 2-10

Environmental Conditions, 2-4

Equipment Location

equipment, 2-2

F

Field Replaceable Units, 6-3

G

Grounding Requirements, 2-11

I

Illustrated Parts Breakdown, 6-1

K

Keyboard Tray installing, 5-13

M

Monitor

connecting.

Monitor Tray

installing.

O

Options, 6-5

P

Power Distribution Unit installing, 5-12 requirements, 2-10

R

Rack

configuration guidelines, 3-6 floor requirements, 2-5 leveling, 4-7

opening doors, 4-5 space requirements, 2-2 spacing components, 3-3 unpacking, 4-3

Rack Components

installing, 5-3 Rack Frame Link Kits

installing, 4-8 Rack Stabilizer installing, 4-10

S

Server

master and protected, 5-10

Side Panels

removing, 4-6

System

configuring, 4-10

System Rack Models

Rack Models, 1-2

System Rack Placement, 2-7

System Rack, 42U, 1-3

System Rack, Multi-Bay, 1-5

T

Typical Configuration, 5-2

U

Uninterruptible Power Source (UPS, 2-10

UPS installing, 5-4

interface expander accessory, 5-6

load calculation and battery run time, 3-8

Index-1

Image 75
Contents EXPRESS5800/System Rack Page EXPRESS5800/System Rack Proprietary Notice and Liability Disclaimer Contents Iv Contents Installing Rack ComponentsUsing This Guide Using This GuideVi Using This Guide Text ConventionsRelated Documents Safety Notices for Users Outside of the U.S.A. and Canada Safety NoticesCare and Handling Viii Using This GuideIntroduction Introduction Express5800 Configuration AssistantIntroduction System Rack ModelsTypical 42U System Rack Enclosure Introduction 42U System RackComponent Description Typical System Rack ComponentsMulti-Bay System Rack Introduction Multi-Bay System RackPage Planning Your Site Equipment Location Space RequirementsPlanning Your Site System Rack Space Requirements Planning Your Site Environmental Conditions Equipment Weight Floor ConstructionTotal Planning Your Site System Rack Placement Distance Between Stabilizer Anchors Temperature and Humidity Requirements Air ConditioningCooling Capacity Electrical Facilities Uninterruptible Power Source UPSPower Distribution Unit PDU Component BTU/hr Times Number Equals InstalledGrounding Requirements Page Planning Your System Rack Configuration Cable Summary Planning Your System Rack ConfigurationCabling Constraints Cable SummaryVertical Spacing RAID Cable RestrictionsConcentrator Cable Lengths Page Rack Components Space Requirements Approximate Vertical Space RequirementsConfiguration Guidelines Inches Component System Rack Configuration WorksheetCalculating Load and Determining UPS On-Battery Run Time Times Number Component Voltage Amps# Systems Load Installed Determining the Load on a Single Power SourceTotal Load Run Time Minutes Total Load Versus On-Battery Run TimeInstalling the System Rack What You Need Installing the System RackUnpacking the System Rack and Components Rack Mounted on Shipping Pallet Installing the System Rack Opening Front and Rear Doors Accessing Door HandlesRemoving Rack Side Panels Removing the Side Panels Installing the System RackLeveling the System Rack Leveling Foot AdjustmentMulti-Bayed Rack System Installing Rack Frame Link KitsRack Frame Link Kit Installation Installing the System Rack Attaching the Front Stabilizers Attaching the Stabilizer to the System RackInstalling Rack Components Typical Configuration Installing Rack ComponentsInch System Rack Tools Required Installing Rack ComponentsRecommendations and Warnings Installing the UPSRefer to UPSInstalling the Interface Expander Accessory Installing the UPS Mounting UPS L-Channel Supports Location of UPS Rear Panel Components Connecting Your Master and Protected servers BSUs Page Installing a Power Distribution Unit 10. Securing the Keyboard Tray Installing Rack Components Installing a Keyboard TrayInstalling the Concentrator 11. Assembling the Concentrator Rails Install the supporting cage-nuts in the rail. See Figure 13. Installing a 1U Filler Panel Installing Rack Components Installing Blank Panels14. Monitor Tray and Mounting Hardware Installing a Monitor TrayConnecting Servers BSUs to the Concentrator Connecting the Console MonitorPage Illustrated Parts Breakdown Field Replaceable Unit Locations Illustrated Parts Breakdown Field Replaceable Units Field Replaceable Units Rack Frame Link Options OptionsPart Number Description Page Index-1 IndexPage Page 456-01544-000