NEC EXPRESS800 manual Installing Rack Frame Link Kits, Multi-Bayed Rack System

Page 46

Installing Rack Frame Link Kits

This section describes how to assemble two or more racks into a multi-bayed system using the rack frame link kit. Figure 4-5 shows a linked multi-bayed system.

Figure 4-5. Multi-Bayed Rack System

What You Need

In addition to the Rack Frame Link shown in Figure 4-6, you will need:

!a #2 and #3 Phillips-head screwdriver to assemble the kit

!a six foot step-ladder

Figure 4-6. Rack Frame Link Kit

!WARNING

It is strongly recommended that two people be present when assembling the rack and installing system components.

4-8 Installing the System Rack

Image 46
Contents EXPRESS5800/System Rack Page EXPRESS5800/System Rack Proprietary Notice and Liability Disclaimer Contents Installing Rack Components Iv ContentsUsing This Guide Using This GuideText Conventions Vi Using This GuideRelated Documents Safety Notices Safety Notices for Users Outside of the U.S.A. and CanadaViii Using This Guide Care and HandlingIntroduction System Rack Models Express5800 Configuration AssistantIntroduction Introduction42U System Rack Typical 42U System Rack Enclosure IntroductionTypical System Rack Components Component DescriptionMulti-Bay System Rack Multi-Bay System Rack IntroductionPage Planning Your Site Space Requirements Equipment LocationPlanning Your Site System Rack Space Requirements Planning Your Site Environmental Conditions Floor Construction Equipment WeightTotal Planning Your Site System Rack Placement Distance Between Stabilizer Anchors Air Conditioning Temperature and Humidity RequirementsCooling Capacity Component BTU/hr Times Number Equals Installed Uninterruptible Power Source UPSPower Distribution Unit PDU Electrical FacilitiesGrounding Requirements Page Planning Your System Rack Configuration Cable Summary Planning Your System Rack ConfigurationCabling Constraints Cable SummaryRAID Cable Restrictions Vertical SpacingConcentrator Cable Lengths Page Vertical Space Requirements Rack Components Space Requirements ApproximateConfiguration Guidelines System Rack Configuration Worksheet Inches ComponentCalculating Load and Determining UPS On-Battery Run Time Determining the Load on a Single Power Source Times Number Component Voltage Amps# Systems Load InstalledTotal Load Versus On-Battery Run Time Total Load Run Time MinutesInstalling the System Rack Installing the System Rack What You NeedUnpacking the System Rack and Components Rack Mounted on Shipping Pallet Installing the System Rack Accessing Door Handles Opening Front and Rear DoorsRemoving the Side Panels Installing the System Rack Removing Rack Side PanelsLeveling Foot Adjustment Leveling the System RackInstalling Rack Frame Link Kits Multi-Bayed Rack SystemRack Frame Link Kit Installation Installing the System Rack Attaching the Stabilizer to the System Rack Attaching the Front StabilizersInstalling Rack Components Installing Rack Components Typical ConfigurationInch System Rack Installing Rack Components Tools RequiredInstalling the UPS Recommendations and WarningsUPS Refer toInstalling the Interface Expander Accessory Installing the UPS Mounting UPS L-Channel Supports Location of UPS Rear Panel Components Connecting Your Master and Protected servers BSUs Page Installing a Power Distribution Unit Installing a Keyboard Tray 10. Securing the Keyboard Tray Installing Rack ComponentsInstalling the Concentrator 11. Assembling the Concentrator Rails Install the supporting cage-nuts in the rail. See Figure Installing Blank Panels 13. Installing a 1U Filler Panel Installing Rack ComponentsInstalling a Monitor Tray 14. Monitor Tray and Mounting HardwareConnecting the Console Monitor Connecting Servers BSUs to the ConcentratorPage Illustrated Parts Breakdown Field Replaceable Unit Locations Illustrated Parts Breakdown Field Replaceable Units Field Replaceable UnitsRack Frame Link Options OptionsPart Number Description Page Index Index-1Page Page 456-01544-000