Emerson
SL-19534
user manual
Liebert Dual Unit Control for InteleCool and InteleCool2
Install
Jumper Settings P2
Switch/jumper settings
Page 1
Pr
e
ci
s
io
n
C
o
o
li
n
g
Fo
r
B
u
si
n
es
s
-C
r
iti
c
al
C
o
n
tinuit
y
™
Li
e
be
r
t D
u
al
Un
it Co
n
t
r
o
l f
or I
n
t
e
l
e
Co
o
l
®
a
n
d I
n
t
e
l
e
Co
o
l
2
®
Us
e
r
M
a
n
u
al
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
Precision Cooling
Liebert Dual Unit Control for InteleCool and InteleCool2
For Business-Critical Continuity
2.0 CONTROL STARTUP
1.0 INSTALLATION
3.0 DISPOSAL OF DUAL UNIT CONTROL
TABLE OF CONTENTS
1.0 INSTALLATION
1.1 Connecting the Dual Unit Controller to an Electronic Thermostat
1.1.1 Connecting the Dual Unit Controller to an InteleCool2
1.1.2 Connecting the Dual Unit Controller to the InteleCool
2.2 Check for Operation
2.1 Start the Dual Unit Control
2.3 Lead Unit Schedule & Selection
2.0 CONTROL STARTUP
To service desired unit
Jumper settings for servicing InteleCool2 unit
Jumper Settings P2
Jumper Setting P4
Disposal of Dual Unit Control
3.0 DISPOSAL OF DUAL UNIT CONTROL
0f Mission-Critical Data And Applications
Ensuring The High Availability
Ne t
ti n
Related pages
Troubleshooting for Philips DVP3250K
Specifications for Toshiba GL-1010
Error messages for Samsung WB2100
Check flow chart For the no power for AOC E941S
When using Component cable Input for Sharp 9JDJ3BX0131A
Installation for Sirius Satellite Radio Stiletto Vechicle Kit Satellite Radio
Parts List for Whirlpool MD364/WH
Language code list for Panasonic SC-HT67
Never connect two power supplies together for Krell Industries EVOLUTION TWO MONAURAL PREAMPLIFIER
How do I maintain the battery life of my Southwing headphones?
Read tips
Top
Page
Image
Contents