SL-19534 Start the Dual Unit Control, Check for Operation, Lead Unit Schedule & Selection
Install
Jumper Settings P2
Switch/jumper settings
Page 5
Page 4
Page 6
Image 5
Page 4
Page 6
Contents
For Business-Critical Continuity
Liebert Dual Unit Control for InteleCool and InteleCool2
Precision Cooling
2.0 CONTROL STARTUP
1.0 INSTALLATION
3.0 DISPOSAL OF DUAL UNIT CONTROL
TABLE OF CONTENTS
1.1.1 Connecting the Dual Unit Controller to an InteleCool2
1.1 Connecting the Dual Unit Controller to an Electronic Thermostat
1.0 INSTALLATION
1.1.2 Connecting the Dual Unit Controller to the InteleCool
2.2 Check for Operation
2.1 Start the Dual Unit Control
2.3 Lead Unit Schedule & Selection
2.0 CONTROL STARTUP
To service desired unit
Jumper settings for servicing InteleCool2 unit
Jumper Settings P2
Jumper Setting P4
Disposal of Dual Unit Control
3.0 DISPOSAL OF DUAL UNIT CONTROL
0f Mission-Critical Data And Applications
Ensuring The High Availability
Ne t
ti n