Emerson SL-19534 Ensuring The High Availability, 0f Mission-Critical Data And Applications, Ne t

Page 8
Image 8
Contents For Business-Critical Continuity Liebert Dual Unit Control for InteleCool and InteleCool2Precision Cooling 1.0 INSTALLATION 2.0 CONTROL STARTUP3.0 DISPOSAL OF DUAL UNIT CONTROL TABLE OF CONTENTS1.1.1 Connecting the Dual Unit Controller to an InteleCool2 1.1 Connecting the Dual Unit Controller to an Electronic Thermostat1.0 INSTALLATION 1.1.2 Connecting the Dual Unit Controller to the InteleCool 2.1 Start the Dual Unit Control 2.2 Check for Operation2.3 Lead Unit Schedule & Selection 2.0 CONTROL STARTUPJumper settings for servicing InteleCool2 unit To service desired unitJumper Settings P2 Jumper Setting P43.0 DISPOSAL OF DUAL UNIT CONTROL Disposal of Dual Unit ControlEnsuring The High Availability 0f Mission-Critical Data And ApplicationsNe t ti n