Emerson SL-19534 Dual Unit Control Board, Jumper settings for servicing InteleCool2 unit

Page 6
Image 6
Contents Liebert Dual Unit Control for InteleCool and InteleCool2 Precision CoolingFor Business-Critical Continuity 3.0 DISPOSAL OF DUAL UNIT CONTROL 1.0 INSTALLATION2.0 CONTROL STARTUP TABLE OF CONTENTS1.1 Connecting the Dual Unit Controller to an Electronic Thermostat 1.0 INSTALLATION1.1.1 Connecting the Dual Unit Controller to an InteleCool2 1.1.2 Connecting the Dual Unit Controller to the InteleCool 2.3 Lead Unit Schedule & Selection 2.1 Start the Dual Unit Control2.2 Check for Operation 2.0 CONTROL STARTUPJumper Settings P2 Jumper settings for servicing InteleCool2 unitTo service desired unit Jumper Setting P43.0 DISPOSAL OF DUAL UNIT CONTROL Disposal of Dual Unit ControlNe t Ensuring The High Availability0f Mission-Critical Data And Applications ti n