Belkin PM00019 -F1DP2XXA Pre-Installation Guidelines, Avoiding general rack-mounting problems

Page 9

INSTALLATION

Table of Contents

sections

1

2

Pre-Installation Guidelines

Place cables away from fluorescent lights, air conditioners, and machines that are likely to generate electrical noise..

Place the Switch on a flat, clean, and dry surface..

The Switch is not intended for connection to exposed outdoor lines..

Ensure that the maximum distance between each computer and the Switch does not exceed 100 ft.. for SIMs..

Avoiding general rack-mounting problems

Elevated operating ambient temperature

The operating ambient temperature of the rack environment may be greater than the room ambient when installing into a closed or multiunit rack assembly.. Install the equipment in an environment compatible with the maximum rated ambient temperature..

Reduced airflow

Install the equipment in a rack in such a way that the amount of airflow required for safe operation is not compromised.. Leave a gap of at least 5cm/2 inches on each side of the Switch..

3

4

5

Mechanical loading

Mount the equipment in the rack in such a way that a hazardous condition is not achieved due to uneven mechanical loading..

Circuit overloading

When connecting the equipment to the supply circuit, consider the effect that overloading of circuits might have on over-current protection and supply wiring..

Reliable electrical grounding of rack-mounted equipment should be maintained.. Provide attention to supply connections other than direct connections to the branch circuit (e..g.., use of power strips)..

OmniView® SMB CAT5 216/232 Switch

7

Image 9
Contents OmniView SMB CAT5 216/232 Switch Table of Contents Sections IntroductionIntroduction Key FeaturesUser-Friendly Interface System Requirements System ContentsOmniView SMB Server Interface Modules TerminologyCAT5 Cables Belkin UTP Patch CablesConnector table Unit Display DiagramsConnector Function LED and button tableAvoiding general rack-mounting problems Pre-Installation GuidelinesRack-mounting the SMB CAT5 Switch InstallationIllustrates the Switch’s system overview Connecting the SystemUSB SIM2 part no.. F1DP101A-AU Server Interface Modules SIMsConnecting a USB SIM Connecting a PS/2 SIMConnecting the CAT5 cables Connecting to the networkConnecting the local console Connecting the power supplyOSD Main window Setting the IP AddressChanging the network parameters SSL certificate notes Logging In to the Web InterfaceLogging WEB InterfaceNetwork Configuration Configuring the SystemLAN Administration User SettingsAdding a user AdministratorUser View onlyEditing a user Administration Server Name EditDeleting a user Blocking a userSecurity Settings Administration Server Access ListPassword Policy Security SSL CertificateStandard High security policy Security policy Maintenance SIM Upgrade Maintenance Switch UpgradeSet Time and Date Restore Factory SettingsSaving Changes and Logging Out Back Up and RestoreOSD Navigating the OSD Main windowSelecting a computer Moving the Confirmation label F1 Tuning F5Settings window F2 Updating the DDC information DDC F10 Saving changes to the settingsAdditional Information Technical SpecificationsProduct Registration SafetyFCC Statement InformationF1DP216A, F1DP232A CE Declaration of ConformityWhat will we do to correct problems? What this warranty coversWhat is not covered by this warranty? How to get serviceHow state law relates to the warranty 4350