Installation Instructions
2.2 Concurrent ECs
(Must be installed together)
None.
2.3 Companion ECs
(May be installed together)
None.
3.0 BMs to Be Installed
Feature
B/M Title
10K8798 Network Node Processor B
4.0 Preparation
1.Familiarize yourself with the purpose and details of the installation instruction before negotiating machine time with the customer.
2.Check all items listed on the BMs to determine that all parts have been received. Refer to Chapter 1 in the Network Node Processor Installation and Maintenance (Based on 6578),
3.The set up of the
4.Obtain from the customer the Parameter worksheet.
5.0 Programming
None.
6.0 Purpose and Description
6.1 Purpose
To increase the reliability of the
3746 | PN 42L2445 |
FFBM | 4 of 10 |
|
|
4
EC F52322 | EC F12701A | EC F70078 | EC F70110 | EC H10024 |
09 Oct 1998 | 14 DEC 1998 | 22 APR 1999 | 20 JAN 2000 | 08 MAR 2001 |
|
|
|
|
|