Installation Instructions

10.3Logging Off the MOSS-E

1.On the 3746-9x0 Menu window, click on Function, then click on Exit.

2.On the MOSS-E View window, click on Program.

3.Click on LOG OFF MOSS-E.

4.Close the front and rear doors of the controller expansion.

10.4Returning the Machine to the Customer

Inform the customer that the NNP backup is installed and operational.

11.0 Test Procedures

No test required.

12.0 Field Updating

None.

After Installation (Steps 13-15)

13.0 Field Updating

None.

14.0 Publications Update

None.

15.0 Parts Disposition

3746

PN 42L2445

FFBM

8 of 10

 

 

8

EC F52322

EC F12701A

EC F70078

EC F70110

EC H10024

09 Oct 1998

14 DEC 1998

22 APR 1999

20 JAN 2000

08 MAR 2001

 

 

 

 

 

Image 8
Contents Ffbm PN 42L2445 Prerequisites Before Installation Steps Machines AffectedRelated BMs and ECs BMs to Be Installed PreparationProgramming Purpose and DescriptionDescription Installation Time Installation Steps SafetyDetails of Installation Installing and Connecting the NNPEnabling the NNP Back-Up Function Click on Close to exit from the functionTest Procedures After Installation Steps Field UpdatingPublications Update Field UpdatingMachine Records Purchased Machines