IBM G41/G50 manual Getting started, Unpacking checklist

Page 6

Getting started

Unpacking

Your monitor is heavy, so handle it with care. Whenever you need to move or lift it, minimise the risk of injury by keeping your back straight and by keeping the weight near to your body. If in doubt, ask someone to assist you.

Lift the monitor by holding it firmly under each side and use proper lifting techniques.

Unpacking checklist

The following items are supplied with this product. If any item is damaged or missing, notify your supplier.

Monitor

Tilt swivel stand (attached)

Signal cable (attached)

Power cable

Also supplied is this User’s guide and a Quick Start information card.

3

Image 6
Contents User’s Guide First Edition Sept TrademarksMexico Power Cords Contents Features of this IBM monitor IntroductionFurther information Unpacking checklist Getting startedUnpacking Product Records General Specifications G50Your Workstation InstallationWorkplace preparation Working AreaConnecting the Monitor Standard connection to a PCOptimising performance Plug and PlayDisplay Modes How to change display modes Addressability Refresh Line RateImage size, position and shape adjustment Adjusting the imageSaving and cancelling changes Geometry resetBrightness and Contrast adjustment Disabling the controlsStandby IndicatorsPower Management SuspendOff DDC Reset Disabling DDCCleaning the Monitor Working with your MonitorWorking Practices Troubleshooting Problem Suggested actionSpecifications section on Further help Glossary DDCSpecifications DimensionsEuropean Union EU Statement SafetyCompliances ErgonomicsWarranties Europe