Cisco Systems 6503 manual Redundant Power Supplies

Page 17
Redundant Power Supplies

DRM

hostname DRM

!

redundancy high-availability config-sync

!

interface Vlan20

ip address 10.20.1.3 255.255.255.0 alt ip address 10.20.1.2 255.255.255.0 standby ip 10.30.1.4

standby priority 100 alt standby priority 50 no ip redirects

!

interface Vlan30

ip address 10.30.1.3 255.255.255.0 alt ip address 10.30.1.2 255.255.255.0 standby ip 10.30.1.4

standby priority 100 alt standby priority 50 no ip redirects

!

end

For DRM, the average failover time was measured at 2.56 seconds. For SRM, the average failover time was measured at 2.31 seconds. Keep in mind that both DRM and SRM will maintain Layer 3 forwarding entries in the hardware-forwarding table (a function of the Cisco Catalyst OS High Availability feature). The difference is that DRM employs two active routers in the chassis and the SRM employs only one router. So SRM requires a routing table recalculation in the software that DRM does not, but neither has a direct effect on the failover time for Layer 3 traffic.

A second test with one workstation running a File Transfer Protocol (FTP) client and another running an FTP server was run. Transferring a 10-MB file across the switch at Layer 3 during normal operations took an average of 16 seconds. If a supervisor switchover takes place during this same FTP session, the transfer time is an average of 18 seconds. During switchover, the difference in FTP transfer time is only 2 seconds. This example is used to demonstrate a realistic TCP application.

A third test with IP phones connected to the Cisco Catalyst 6500 Series involved establishing an IP phone call between one local IP phone and one remote IP phone. With the Cisco Catalyst OS High Availability feature enabled, a supervisor engine switchover was initiated. The IP phone call was maintained through the switchover and the call participants noticed minimal disruption. This provides a real-world example of the capability of the Cisco Catalyst 6500 to provide high availability in all layers of the network.

For general purposes, it is still maintained that the Layer 2 and Layer 3 stateful supervisor engine switchover will take place in less than three seconds to cover most real-world scenarios.

Redundant Power Supplies

Currently the Cisco Catalyst 6500 Series can be configured with a 1000- (6-slot chassis only), 1300-, 2500-, or 4000-watt power supply. In addition, a power redundancy feature is available to further specify the power configuration via software. By default, the power redundancy (or load sharing) feature is enabled. With two power supplies installed and power redundancy enabled, the total power drawn from both supplies is at no time greater than the capability of one supply. If one power supply fails, the other power supply can take over the load and the complete system remains powered. If power redundancy is

Cisco Systems, Inc.

All contents are Copyright © 1992–2002 Cisco Systems, Inc. All rights reserved. Important Notices and Privacy Statement.

Page 17 of 19

Image 17
Contents White Paper High Availability for the Cisco Catalyst 6500 Series SwitchesSwitching Fabric Operation Switch Fabric Module RedundancySwitching Fabric Failover CLI output description for show fabric channel switchmode Example 1 Fabric-Enabled SystemExample 2 Classic and Fabric-Enabled System Redundant Supervisor Engines Supervisor Engine SwitchoverSupervisor Fast Switchover Sup-A enable set system highavailability enable Supervisor High Availability FeatureSupervisor Stateful Protocol Redundancy and incompatible Supervisor Engine Image Synchronization Supervisor Engine Software Image UpgradesProtocol Database Standby SupervisorSup-A enable show system highavailability Supervisor Engine Versioning Feature6. Sup-A enable set boot system flash bootflashcat6000-sup2k8.7-2-2.bin Cisco Catalyst OS Image Upgrade ProcedureMSFC High Availability Features DRM Operation MSFC Configuration SynchronizationDual Router Mode DRM Challenges WAN Interfaces in DRMSRM Operation Single Router ModeWAN Interfaces in SRM SRM Configuration and Conversion ProcedureSupervisor and MSFC Failover Tests SRM and IP MulticastRedundant Power Supplies Conclusion European Headquarters Corporate HeadquartersAmericas Headquarters Asia Pacific Headquarters