Cisco Systems N55M4Q, N5KC5548UPFA manual Switch Hardware Best Practices, Power Supply Conditions

Page 154

Appendix E Troubleshooting Hardware Components

Switch Hardware Best Practices

Se n d d o c u m e n t a t i o n c o m m e n t s t o n ex u s 5 k d o c s @ c i s c o . c o m .

Switch Hardware Best Practices

Use the recommendations in this section to ensure the proper installation, initialization, and operation of the switch.

This section includes the following topics:

Installation Best Practices, page E-2

Initialization Best Practices, page E-2

Switch Operation Best Practices, page E-2

Installation Best Practices

When installing the switch, follow these best practices:

Plan your site configuration and prepare the site before installing the chassis.

Verify that you have the appropriate power supplies for your chassis configuration.

Install the chassis following the rack and airflow guidelines presented in this guide.

Verify that the chassis is adequately grounded.

Initialization Best Practices

When the initial system boot is complete, verify the following:

Power supplies are supplying power to the system.

Fan modules are operating normally.

The system software boots successfully.

Switch Operation Best Practices

To ensure proper operation of your switch, take the following actions:

Make a copy of the running configuration to CompactFlash for a safe backup.

Always enter the copy running-configstartup-configCLI command after you modify the running configuration and ensure that the system is operating properly.

Never use the init system CLI command unless you understand that you will lose the running and startup configuration as well as the files stored on bootflash:.

Keep backup copies of the running kickstart and the system images on CompactFlash.

Power Supply Conditions

The two LEDs on each power supply indicate the power status for each power supply. To determine the current status for a power supply unit, note which LED is on, blinking, or off and refer to Table E-1.

Cisco Nexus 5000 Series Hardware Installation Guide

 

E-2

OL-15902-02

 

 

 

Image 154
Contents Cisco Nexus 5000 Series Hardware Installation Guide Americas HeadquartersPage Iii Cisco Nexus 5548UP and 5548P Switches Replacing Components Replacing or Installing Power Supplies LEDs D-1 Viii Organization AudienceChapter and Title Description Conventions Bewaar Deze InstructiesAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Preface Related Documentation Configuration GuidesInstallation and Upgrade Guides Release NotesTroubleshooting Guide Command ReferencesError and System Messages Licensing GuideXviii Cisco Nexus 5500 Platform Switches A P T E RFeatures Cisco Nexus 5596UP SwitchChassis Front View of the Cisco Nexus 5596UP Switch Rear View of the Cisco Nexus 5596UP Switch Expansion ModulesPort Qsfp GEM Port Universal GEM2Layer 3 GEM Ports Power Supply Part Number Power Supply9shows the NXA-PAC-1100W Fan Module 10NXA-PAC-1100W-BTransceivers SFP+ TransceiversSFP Fibre Channel Transceivers Cisco Nexus 5596T SwitchSFP+ Copper Cables Cwdm OpticsFeatures 13 Front View of the Cisco Nexus 5596T Switch 15shows how ports are numbered and grouped by function SFP-10G-LR= SFP-10G-ER= Cisco Nexus 5548UP and 5548P Switches Transceivers and Cables, ID LED N55 M16P Generic Expansion Module ID LED18 Components Used to Install the N55 M16P GEM N55 M8P8FP Generic Expansion Module20 Components Used to Install the N55 M8P8FP GEM N55 M16UP Generic Expansion ModulePower Supplies Data PortsPart Number Power Supply Fan Modules Fail top and OK bottom LEDs Release latch HandleTransceivers Transceivers and CablesCisco SFP Description SFP-10G-SR SFP-10G-LR Cables DS-SFP-FC4G-LWPower Each Transceiver Connector Media Cable Distance Side Cisco Nexus 5000 Platform SwitchesCisco Nexus 5020 Switch StandardTwo power supplies System status LED Five fan modules 28 Cisco Nexus 5020 Switch Rear View 30 Fibre Channel Plus Ethernet Expansion Module Features Fibre Channel Plus Ethernet Expansion ModuleEthernet Expansion Module 31shows the Ethernet and Fibre Channel ports are numberedN5K-M1008 Generic Expansion Module N5K-M1060 Generic Expansion ModuleSix 8-, 4-, 2-, or 1-Gbps Fibre Channel ports 186386 Fault top and OK bottom LEDs Handle Release lever Fan module LED Captive screw Transceivers Cisco Nexus 5010 Switch Two power supplies System status LED Two fan modules N5K-M1404 Generic Expansion Module, N5K-M1404 Generic Expansion Module 45 N5K-M1404 Generic Expansion ModuleN5K-M1600 Generic Expansion Module 46 Front of the N5K-M1404 GEM48 N5K-M1008 GEM 51shows how the ports are numbered on this module 192241 192243 55 Power Supply for the Cisco Nexus 5010 Switch Handle Fan module LED Model Description Overview Cisco Nexus 5000 Platform Switches Installing the Cisco Nexus 5000 Series Switches Chassis Weight Preparing for InstallationInstallation Options with Racks and Cabinets Airflow DirectionInstallation Guidelines Unpacking and Inspecting the Switch Required EquipmentInstalling a Cisco Nexus 5596 Switch Installing the SwitchQuantity Part Description Attaching Rack-Mount Brackets to the Cisco Nexus 5596 Switch Installing the Slider Rails Sliding the Chassis Into the Rack Installing the Cisco Nexus 5548 Switch Step Installing the Cisco Nexus 5020 Switch Cisco Nexus 5020 Switch Rack-Mount Kit Installing the Slider Rails 10 Attaching the Switch to the Rack Installing the Cisco Nexus 5010 Switch 12 Installing the Slider Rails Grounding the Switch Proper Grounding PracticesEnvironment Severity Level Grounding Recommendations Preventing Electrostatic Discharge Damage 186482 Establishing the System Ground Required Tools and EquipmentGrounding the Cisco Nexus 5500 Series Chassis 239272 Grounding the Cisco Nexus 5000 Series Chassis Starting the Switch 239212 OL-15902-02 OL-15902-02 Connecting the Switch Connecting to the Console Port Preparing for Network ConnectionsConnecting to the Ethernet Connector Port Installing and Replacing SFP+ Transceivers Connecting to an Ethernet PortInstalling an SFP+ Transceiver Replacing an SFP+ Transceiver Installing Cables into SFP+ Transceivers Installing a Cable into an SFP+ TransceiverConnecting to a Fibre Channel Port Replacing a Cable for an SFP+ TransceiverInstalling an SFP Transceiver Removing and Installing SFP TransceiversRemoving an SFP Transceiver Alternate Removal Method for Bale Clasp SFP Transceivers Removing and Installing Cables into SFP Transceivers Installing a Cable into an SFP TransceiverMaintaining SFP Transceivers and Fiber-Optic Cables Removing a Cable from an SFP TransceiverOL-15902-01 Replacing an I/O Module for a Cisco Nexus 5548 Switch Replacing ComponentsRemoving an I/O Module Product ID on a Layer 3 I/O ModuleRemoving a Fan Tray from the I/O Module in the Chassis Installing an I/O Module Removing the I/O Module from the ChassisReplacing Expansion Modules Positioning the Module in the Cisco Nexus 5548 Chassis Positioning the Module in the Cisco Nexus 5020 Chassis Replacing or Installing Power Supplies Positioning the Module in the Cisco Nexus 5010 ChassisRemoving a Power Supply Removing the Power Supply from a Cisco Nexus 5596 SwitchRemoving the Power Supply from a Cisco Nexus 5548 Switch Installing a Power Supply 11 Removing the Power Supply from a Cisco Nexus 5010 SwitchWiring a DC Power Connector Removing a Fan Module, Installing a Fan Module, Replacing a Fan ModuleInstalling a Fan Module Removing a Fan Module14 Installing a Fan Module in a Cisco Nexus 5548 Chassis 15 Installing a Fan Module in a Cisco Nexus 5020 Chassis Replacing Components OL-15902-01 Cabinet and Rack Requirements General Requirements for Cabinets and RacksCable Management Guidelines Requirements Specific to Perforated CabinetsSwitch Specifications Description SpecificationProperty Cisco Nexus 5596 Switch Cisco Nexus 5548 Switch Environmental SpecificationsProperty Cisco Nexus 5020 Switch Cisco Nexus 5010 Switch Specifications for the Cisco Nexus 5596 Power Supply Expansion Module SpecificationsPower Specifications AC Power Supply Properties SpecificationSpecifications for the Cisco Nexus 5548 Power Supply DC Power Supply Properties SpecificationSpecifications for the Cisco Nexus 5020 Power Supplies Specifications for the Cisco Nexus 5010 Power SupplyTransceiver Specifications Description Short RangeParameter Symbol Minimum Maximum Unit Description Short WavelengthOL-15902-01 Cable and Port Specifications Console CablePin Signal Cable RJ-45 Connector PinoutsSignal Name P1, P1-45 Pins P2, DB-9 Pins Console PortLength Supported Power Cords and PlugsDescription Feet Meters Illustration CAB-9K10A-IT CAB-9K10A-AU VSCC15 CAB-9K10A-SW CAB-N5K6A-NA Jumper Power Cord SS10AFigure C-16 CAB-C13-C14-JMPR, Jumper Power Cord LEDs Component Chassis and Module LED DescriptionsStatus Description Conditions Indicated by the Power Supply LEDs Power Supply Condition Green AmberEthernet and Fibre Channel LEDs Port LEDsEthernet Port LEDs Link State LED StateOverview Snmp TrapsInstallation Best Practices Switch Hardware Best PracticesPower Supply Conditions Switch Operation Best PracticesPower Supply Condition Power LED Status Fail LED Status Cisco Nexus 5000 Series Hardware Installation Guide Accessory Kits Cisco Nexus 5596UP and 5596T Switch Accessory KitCisco Nexus 5020 Switch Accessory Kit Cisco Nexus 5010 Switch Accessory KitOL-15902-02-xx Cisco Nexus 5000 Series Hardware Installation Guide Site Planning and Maintenance Records Site Preparation ChecklistTask No Planning Activity Verified By Time Date Contact and Site Information Chassis and Module Information Slot Module Type Module Serial Number SupervisorNumerics IN-2 IN-3 IN-4
Related manuals
Manual 36 pages 49.44 Kb