Cisco Systems N55M4Q manual Switch Installation, Preparing for Installation

Page 1

C H A P T E R 2

Switch Installation

This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that ensures proper operation. It also describes how to install the switch.

Read the topics and perform the procedures in this order:

Preparing for Installation, page 2-1

Verifying Switch Operation, page 2-5

Mounting the Switch, page 2-5

Installing a Cover for the Reset Button (Optional), page 2-24

Installing the Power Cord Retainer (Optional), page 2-25

Installing the Cable Guard (Optional), page 2-28

Connecting Devices to the Ethernet Ports, page 2-33

Preparing for Installation

Warnings, page 2-1

Installation Guidelines, page 2-3

Equipment That You Supply, page 2-4

Box Contents, page 2-4

Powering the Switch, page 2-4

Warnings

These warnings are translated into several languages in the Regulatory Compliance and Safety Information for the Catalyst 3560-C and the 2960-C Switches guide.

Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

 

OL-23803-02

2-1

 

 

 

Image 1
Contents Preparing for Installation Switch InstallationStatement Installation Guidelines Box Contents Powering the SwitchEquipment That You Supply Mounting the Switch Verifying Switch OperationDesk, Shelf, or Wall with Mounting Screws On a Desk or Shelf without Mounting ScrewsDesk- or Shelf-Mounting Installing the Mounting Screws on Top of a Desk or a Shelf Under the Desk- or Shelf-Mounting Mounting the Switch on Top of a Desk or ShelfDesk or shelf Screws Screw template Adhesive Desk or shelf Slides on this way Wall-Mounting77 in .49 cm 72 in .44 cm 46. 62 in .19 cm Switch Installing the Mounting Screws on the Wall Mounting Tray with Screws With a Mounting TraySwitch Mounting tray Sliding direction Desk Mounting Tray with a Magnet 10 Securing the Mounting Tray to the SwitchPlace the switch on the mounting tray. See Figure 13 Wall-Mounting with a Magnet A Rack Attaching Brackets to the Switch15 Attaching the 23-inch Brackets for Rack-Mounting Mounting the Switch in a RackOn a DIN Rail Attaching the DIN-Mount Tray to the Switch18 Securing the DIN-Mount Tray to the Switch Mounting the Switch on a DIN Rail19 Mounting the Switch on a DIN Rail Removing the Switch from a DIN Rail 21 Reset Cover on the Catalyst 2960CPD-8PT-L Switch Installing a Cover for the Reset Button Optional23 Inserting the Retainer through the Lanced Loop Installing the Power Cord Retainer OptionalSlide the retainer through the first latch. See Figure 26 Sleeve Around the Power Cord Washer Installing the Cable Guard Optional29 Attaching the Cable Guard to the Switch 31 Attaching the Cables to the Switch Installing SFP Modules After Installing the SwitchRemoving SFP Modules 34 Installing an SFP ModuleConnecting to the 10/100 and 10/100/1000 Ports Connecting Devices to the Ethernet PortsDevice Crossover Cable Connecting to the PoE PortsWhere to Go Next OL-23803-02
Related manuals
Manual 168 pages 60.68 Kb