Cisco Systems N55M4Q manual Switch Mounting tray Sliding direction Desk

Page 14

Chapter 2 Switch Installation

Mounting the Switch

1

2

Number-8 Phillips pan-head screws

3 Desk or shelf

Mounting tray

Step 4 Place the switch onto the mounting screws, and slide the switch until it locks into place. See Figure 2-9.

Figure 2-9 Installing the Switch on the Mounting Tray

 

 

 

 

SYST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STAT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DPLX

1

 

 

 

 

 

 

 

 

 

 

 

MODE

 

 

 

SPD

 

2

3

 

 

 

 

 

 

 

 

 

 

 

 

PoE

 

 

 

 

4

5

6

 

 

 

Series

PD

 

 

C

ONSOLE

PD

 

 

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

POWER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OVER

ET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HERNET

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

1

2

3

4

1

Switch

3

Mounting tray

2

Sliding direction

4

Desk

 

 

 

 

282396

 

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

2-14

OL-23803-02

Image 14
Contents Switch Installation Preparing for InstallationStatement Installation Guidelines Equipment That You Supply Powering the SwitchBox Contents Verifying Switch Operation Mounting the SwitchDesk- or Shelf-Mounting On a Desk or Shelf without Mounting ScrewsDesk, Shelf, or Wall with Mounting Screws Installing the Mounting Screws on Top of a Desk or a Shelf Mounting the Switch on Top of a Desk or Shelf Under the Desk- or Shelf-MountingDesk or shelf Screws Screw template Adhesive Wall-Mounting Desk or shelf Slides on this way77 in .49 cm 72 in .44 cm 46. 62 in .19 cm Switch Installing the Mounting Screws on the Wall With a Mounting Tray Mounting Tray with ScrewsSwitch Mounting tray Sliding direction Desk 10 Securing the Mounting Tray to the Switch Mounting Tray with a MagnetPlace the switch on the mounting tray. See Figure 13 Wall-Mounting with a Magnet Attaching Brackets to the Switch A RackMounting the Switch in a Rack 15 Attaching the 23-inch Brackets for Rack-MountingAttaching the DIN-Mount Tray to the Switch On a DIN RailMounting the Switch on a DIN Rail 18 Securing the DIN-Mount Tray to the Switch19 Mounting the Switch on a DIN Rail Removing the Switch from a DIN Rail Installing a Cover for the Reset Button Optional 21 Reset Cover on the Catalyst 2960CPD-8PT-L SwitchInstalling the Power Cord Retainer Optional 23 Inserting the Retainer through the Lanced LoopSlide the retainer through the first latch. See Figure 26 Sleeve Around the Power Cord Installing the Cable Guard Optional Washer29 Attaching the Cable Guard to the Switch 31 Attaching the Cables to the Switch After Installing the Switch Installing SFP Modules34 Installing an SFP Module Removing SFP ModulesConnecting Devices to the Ethernet Ports Connecting to the 10/100 and 10/100/1000 PortsConnecting to the PoE Ports Device Crossover CableWhere to Go Next OL-23803-02
Related manuals
Manual 168 pages 60.68 Kb