Cisco Systems N55M4Q manual Slide the retainer through the first latch. See Figure

Page 26

Chapter 2 Switch Installation

Installing the Power Cord Retainer (Optional)

Step 3 Slide the retainer through the first latch. See Figure 2-24.

Figure 2-24 Sliding the Retainer Through the Latch

1

RESET

 

3

2

1 AC power cord

3 Latch

2Smaller sleeve for thin power cords

Step 4 Slide the retainer through the other latches to lock it. See Figure 2-25.

Figure 2-25 Locking the Retainer

208985

1

RESET

 

2 3

(

1 AC power cord

3 Latches

2Sleeve for thin power cords

208986

Step 5 (Optional) Use the small sleeve for thin power cords. Use the small sleeve to provide greater stability for thin cords. Detach the sleeve, and slide it over the power cord. See Figure 2-26.

 

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

2-26

OL-23803-02

Image 26
Contents Switch Installation Preparing for InstallationStatement Installation Guidelines Equipment That You Supply Powering the SwitchBox Contents Verifying Switch Operation Mounting the SwitchDesk- or Shelf-Mounting On a Desk or Shelf without Mounting ScrewsDesk, Shelf, or Wall with Mounting Screws Installing the Mounting Screws on Top of a Desk or a Shelf Mounting the Switch on Top of a Desk or Shelf Under the Desk- or Shelf-MountingDesk or shelf Screws Screw template Adhesive Wall-Mounting Desk or shelf Slides on this way77 in .49 cm 72 in .44 cm 46. 62 in .19 cm Switch Installing the Mounting Screws on the Wall With a Mounting Tray Mounting Tray with ScrewsSwitch Mounting tray Sliding direction Desk 10 Securing the Mounting Tray to the Switch Mounting Tray with a MagnetPlace the switch on the mounting tray. See Figure 13 Wall-Mounting with a Magnet Attaching Brackets to the Switch A RackMounting the Switch in a Rack 15 Attaching the 23-inch Brackets for Rack-MountingAttaching the DIN-Mount Tray to the Switch On a DIN RailMounting the Switch on a DIN Rail 18 Securing the DIN-Mount Tray to the Switch19 Mounting the Switch on a DIN Rail Removing the Switch from a DIN Rail Installing a Cover for the Reset Button Optional 21 Reset Cover on the Catalyst 2960CPD-8PT-L SwitchInstalling the Power Cord Retainer Optional 23 Inserting the Retainer through the Lanced LoopSlide the retainer through the first latch. See Figure 26 Sleeve Around the Power Cord Installing the Cable Guard Optional Washer29 Attaching the Cable Guard to the Switch 31 Attaching the Cables to the Switch After Installing the Switch Installing SFP Modules34 Installing an SFP Module Removing SFP ModulesConnecting Devices to the Ethernet Ports Connecting to the 10/100 and 10/100/1000 PortsConnecting to the PoE Ports Device Crossover CableWhere to Go Next OL-23803-02
Related manuals
Manual 168 pages 60.68 Kb