Cisco Systems N55M4Q manual Verifying Switch Operation, Mounting the Switch

Page 5

Chapter 2 Switch Installation

Verifying Switch Operation

Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power input takes precedence.

Catalyst 3560CPD-8PT-S

Connect a 10/100/1000 uplink port to a PoE+ switch, such as a Catalyst 3750-X. Or

Plug the auxiliary power adapter cord into the switch AUX power connector and into an AC power outlet.

Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power input takes precedence.

All models (except the Catalyst 2960CPD-8PT-L, 2960CPD-8TT-L, and 3560CPD-8PT-S)

Plug the AC power cord to the switch AC power connector and into an AC power outlet.

Verifying Switch Operation

As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the switch functions properly. LEDs blink during the test, which lasts approximately 1 minute. When the switch begins POST, the System, Status, Duplex, and Speed LEDs turn green. The System LED blinks green, and the other LEDs remain green.

When the POST completes successfully, the System LED turns green. The other LEDs turn off and then reflect the switch operating status. If a switch fails POST, the System LED turns amber.

POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.

After a successful POST, unplug the power cord from the switch. Mount the switch in a rack on a desk or shelf, under a desk or shelf, or on a wall, as described in the “Mounting the Switch” section on page 2-5.

Mounting the Switch

On a Desk or Shelf (without Mounting Screws)

Desk, Shelf, or Wall (with Mounting Screws)

With a Mounting Tray

In a Rack

On a DIN Rail

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

 

OL-23803-02

2-5

 

 

 

Image 5
Contents Preparing for Installation Switch Installation Statement Installation Guidelines Equipment That You Supply Powering the SwitchBox Contents Mounting the Switch Verifying Switch OperationDesk- or Shelf-Mounting On a Desk or Shelf without Mounting ScrewsDesk, Shelf, or Wall with Mounting Screws Installing the Mounting Screws on Top of a Desk or a Shelf Under the Desk- or Shelf-Mounting Mounting the Switch on Top of a Desk or ShelfDesk or shelf Screws Screw template Adhesive Desk or shelf Slides on this way Wall-Mounting77 in .49 cm 72 in .44 cm 46. 62 in .19 cm Switch Installing the Mounting Screws on the Wall Mounting Tray with Screws With a Mounting TraySwitch Mounting tray Sliding direction Desk Mounting Tray with a Magnet 10 Securing the Mounting Tray to the SwitchPlace the switch on the mounting tray. See Figure 13 Wall-Mounting with a Magnet A Rack Attaching Brackets to the Switch15 Attaching the 23-inch Brackets for Rack-Mounting Mounting the Switch in a RackOn a DIN Rail Attaching the DIN-Mount Tray to the Switch18 Securing the DIN-Mount Tray to the Switch Mounting the Switch on a DIN Rail19 Mounting the Switch on a DIN Rail Removing the Switch from a DIN Rail 21 Reset Cover on the Catalyst 2960CPD-8PT-L Switch Installing a Cover for the Reset Button Optional23 Inserting the Retainer through the Lanced Loop Installing the Power Cord Retainer OptionalSlide the retainer through the first latch. See Figure 26 Sleeve Around the Power Cord Washer Installing the Cable Guard Optional29 Attaching the Cable Guard to the Switch 31 Attaching the Cables to the Switch Installing SFP Modules After Installing the SwitchRemoving SFP Modules 34 Installing an SFP ModuleConnecting to the 10/100 and 10/100/1000 Ports Connecting Devices to the Ethernet PortsDevice Crossover Cable Connecting to the PoE PortsWhere to Go Next OL-23803-02
Related manuals
Manual 168 pages 60.68 Kb