Page 23

Chapter 2 Switch Installation

Mounting the Switch

Removing the Switch from a DIN Rail

Step 1 Ensure that power is removed from the switch, and disconnect all cables and connectors from the front panel of the switch.

Step 2 Pull down on the DIN rail mount release tabs. As the clips release, lift the bottom of the switch. See Figure 2-20.

Figure 2-20

Switch Removal

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

1

344246

Switch

 

 

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

 

 

 

 

 

 

OL-23803-02

 

 

2-23

 

 

 

 

 

Image 23
Contents Preparing for Installation Switch InstallationStatement Installation Guidelines Equipment That You Supply Powering the SwitchBox Contents Mounting the Switch Verifying Switch OperationDesk- or Shelf-Mounting On a Desk or Shelf without Mounting ScrewsDesk, Shelf, or Wall with Mounting Screws Installing the Mounting Screws on Top of a Desk or a Shelf Under the Desk- or Shelf-Mounting Mounting the Switch on Top of a Desk or ShelfDesk or shelf Screws Screw template Adhesive Desk or shelf Slides on this way Wall-Mounting77 in .49 cm 72 in .44 cm 46. 62 in .19 cm Switch Installing the Mounting Screws on the Wall Mounting Tray with Screws With a Mounting TraySwitch Mounting tray Sliding direction Desk Mounting Tray with a Magnet 10 Securing the Mounting Tray to the SwitchPlace the switch on the mounting tray. See Figure 13 Wall-Mounting with a Magnet A Rack Attaching Brackets to the Switch15 Attaching the 23-inch Brackets for Rack-Mounting Mounting the Switch in a RackOn a DIN Rail Attaching the DIN-Mount Tray to the Switch18 Securing the DIN-Mount Tray to the Switch Mounting the Switch on a DIN Rail19 Mounting the Switch on a DIN Rail Removing the Switch from a DIN Rail 21 Reset Cover on the Catalyst 2960CPD-8PT-L Switch Installing a Cover for the Reset Button Optional23 Inserting the Retainer through the Lanced Loop Installing the Power Cord Retainer OptionalSlide the retainer through the first latch. See Figure 26 Sleeve Around the Power Cord Washer Installing the Cable Guard Optional29 Attaching the Cable Guard to the Switch 31 Attaching the Cables to the Switch Installing SFP Modules After Installing the SwitchRemoving SFP Modules 34 Installing an SFP ModuleConnecting to the 10/100 and 10/100/1000 Ports Connecting Devices to the Ethernet PortsDevice Crossover Cable Connecting to the PoE PortsWhere to Go Next OL-23803-02