Installing a Port Adapter
Step 5 With the port adapter halfway in the slot, connect all required cables to the port adapter.
Step 6 After connecting all required cables, carefully slide the port adapter all the way into the slot until the port adapter is seated in the router midplane.
Step 7 After seating the port adapter in the router midplane, move the port adapter lever to the locked position. Figure
Note If the port adapter lever does not move to the locked position, the port adapter is not completely seated in the midplane. Carefully pull the port adapter halfway out of the slot, reinsert it, and move the port adapter lever to the locked position.
Figure 4-5 Placing the Port Adapter Lever in the Locked Position—Cisco 7206
|
|
|
|
|
|
|
|
|
|
| 6 |
5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ETHERNET 10BT |
|
| FAST ETHERNET |
|
|
|
|
|
|
|
| ENABLED |
| LINK RJ45 |
|
| |
|
|
|
|
|
|
| MII |
| 4 | ||
3 |
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| 0 |
|
|
|
|
|
|
|
|
| FAST SERIAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2 |
1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| SLOT | 1 | FE | MII |
| FAST ETHERNET INPUT/OUTPUT CONTROLLER |
| H6747 | |
|
|
|
|
|
|
|
| 0 | |||
ENABLED |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
| ||
PCMCIA | EJECT | SLOT | 0 |
|
| MII | RJ45 | RJ45 |
|
| |
|
|
|
|
| |||||||
|
|
| EN | EN | LINK |
|
| ||||
|
|
|
|
|
|
|
| Port adapter |
|
| |
|
|
|
|
|
|
|
| handle |
|
|
|
Note: This adapter installation applies to any port or service adapter.
Port adapter lever (locked position)
This completes the procedure for installing a new port adapter in a Cisco 7200 series router. Proceed to Chapter 7, “Installing the