6Powering on the Cisco uBR7246VXR Router
Warning | Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages |
| and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other |
| equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, |
| faceplates, front covers, and rear covers are in place. Statement 1029 |
|
|
After installing your Cisco uBR7246VXR universal broadband router and connecting cables, power on the router as follows:
Step 1 Check for the following:
a.Every module is securely inserted in the right slot and the captive installation screws are tightened.
b.All network interface line cables are connected to the port adapters.
c.Hybrid
d.Primary and secondary
e.Each port adapter is inserted in its slot and the port adapter lever or retention clip is in the locked position.
Caution If the port adapters, cable interface line cards, network processing engine, or I/O controller are not properly seated
or not fully locked into place, the Cisco uBR7246VXR router might enter a continuous restart loop.
f.A flash memory card is installed in its Personal Computer Memory Card International Association (PCMCIA) slot.
g.Each
h.The +48 and
i.Each DC lead is connected and secured to the power source and the chassis is properly grounded.
j.For installed
k.The console terminal is turned on.
Step 2 Place the power switch on the power supply in the ON () position. Repeat this step if a second power supply is installed. The green OK LED on the power supply comes on.
Step 3 Listen for the fans; you should immediately hear them operating. In a very noisy environment, also look for air movement around the chassis to verify that the fans are operating. If the Cisco uBR7246VXR router was recently switched off, it might take up to 90 seconds for the power supply to restart and the fans to start operating.
Step 4 During the boot process, observe the system LEDs. The LEDs on most of the port adapters come on and go off in an irregular sequence. Some may come on, go off, and come on again for a short time. On the I/O controller, the POWER OK LED comes on immediately.
Step 5 Observe the initialization process. When the system boot is complete (a few seconds), the NPE begins to initialize the port adapter, cable interface line cards, and the I/O controller. During this initialization, the LEDs on each port adapter behave differently (most flash on and off). The ENABLED LED on each port adapter and cable interface line card comes on when initialization is complete, and the console screen displays a script and system banner similar to the following:
Cisco Internetwork Operating System Software
IOS (tm) uBR7200 Software
Copyright (c)
Compiled Mon
Tip To facilitate headend or hub installation, a Cisco uBR7246VXR universal broadband router equipped with at least one cable interface line card (Cisco
19