Cisco Systems uBR7246VXR quick start Other Troubleshooting Information Websites

Page 22

Note If you are using a Cisco uBR7200-NPE-G1, you do not need an I/O controller module installed in the chassis. Use the show version command (Router# show version) to determine the NPE that is installed in your router.

3.If the clock card ENABLED LED is off, verify that the card is securely installed in the chassis.

4.Always verify that the fans are operating. If the following message is displayed,

Queued messages:

%ENVM-1-SHUTDOWN: Environmental Monitor initiated shutdown

This message indicates that the system has detected an overtemperature condition or power out-of-tolerance condition inside the chassis. The shutdown message could also indicate a faulty component or temperature sensor. Before the system shuts down, use the show environment or show environment table command to display the internal chassis environment.

Other Troubleshooting Information Websites

These websites are provided to help you find the most current troubleshooting information:

Search the Cisco TAC assistance website, at the following URL: http://www.cisco.com/en/US/support/index.html

Choose the type of information you need (Hardware Support, Software Support, Technical Support, Tools, Downloads).

Search cable products field notices at the following URL: http://www.cisco.com/public/support/tac/fn_index.html

22

Image 22
Contents Cisco uBR7246VXR Universal Broadband Router Replacement, Repair, or Refund Policy for Hardware Cisco One-Year Limited Hardware Warranty TermsDuration of Hardware Warranty To Receive a Return Materials Authorization RMA NumberCisco uBR7246VXR Components OverviewStatement Card Slot and Logical Interface Numbering Front and Rear Chassis ViewsSpecification Minimum Maximum Power GuidelinesTemperature and Humidity Requirements Site PreparationCabling Guidelines Power Connection Guidelines for DC-Powered SystemsIEC 60950 based safety standards. Statement Ethernet and Fast Ethernet ConnectionsWorkbench and Tabletop Installation Guidelines Installing the ChassisRack-Mount Installation Guidelines Installation Tools and EquipmentVerifying Contents After Unpacking Attaching the Rack-Mount BracketsAttach the Rack-Mount Brackets to the Rear of the Chassis Attach the Rack-Mount Brackets to the Front of the ChassisAttach the Rack-Mount Brackets to the Middle of the Chassis Installing the Cable-Management Brackets Location of Cable Management BracketInstalling the Chassis in the Rack Connecting the Chassis to Ground Installing the Chassis on a Workbench or TabletopUse copper connectors only. Statement Page Connecting the Chassis to Power AC and DC Power SuppliesAC Power Supplies DC Power SuppliesTools Disconnected last. StatementReplacing the Strain-Relief Cover on a DC-Input Power Supply CablingPowering on the Cisco uBR7246VXR Router Page Troubleshooting the Installation Identify Startup ProblemsOther Troubleshooting Information Websites Related Documentation Obtaining Documentation and Submitting a Service Request