Installation and Operation, cont’d
Furniture mounting
To
1. | If rubber feet were previously attached to the bottom of the |
| unit, remove them. |
2. | Remove the two screws from one side of the YCS. Retain |
| the screws for possible later reassembly. |
3. | Attach one bracket to the side of the unit, using the |
| provided machine screws (see figure |
Figure 2-6 — Preparing the YCS 100 for under-desk mounting
4. | Repeat steps 2 and 3 on the other side of the YCS. |
5. | Hold the unit with the attached brackets against the |
| underside of the table or other furniture. On the mounting |
| surface, mark the location of the bracket’s screw holes. |
6. | Drill 3/32" (2 mm) diameter pilot holes, ¼" (6.3 mm) deep |
| in the mounting surface at the marked screw locations. |
7. | Insert #8 wood screws into the four pilot holes. Tighten |
| each screw into the mounting surface until slightly less |
| than ¼" of the screw head protrudes. |
8. | Align the mounting screws with the slots in the brackets |
| and place the unit against the surface, with the screws |
| through the bracket slots. |
9. | Slide the unit slightly forward or back, then tighten all four |
| screws to secure it in place. |
Projector mounting
To
Using the PMK 100 Mini Projector Mount Kit
The PMK 100 is a projector mounting kit (part #
Follow these steps to
1. | If rubber feet were previously attached to the bottom of the | |
| unit, remove them. |
|
2. | Remove the two screws from one side of the YCS. Retain | |
| the screws for possible later reassembly. | |
3. | Attach the projector mounting bracket to the side of the | |
| unit, using the provided machine screws. | |
|
| Mounting |
| Projector | Bolt |
|
| |
| Mounting |
|
| Bracket |
|
Ceiling
Projector
Figure 2-7 — Projector-mounting the YCS 100 using the PMK 100 Projector Mount kit
4. | Secure the unit to a projector mount or other surface by |
| inserting the mounting bolt through the bracket’s slotted |
| hole. |
YCS 100 • Installation and Operation | YCS 100 • Installation and Operation |