Sun Microsystems 4000, 5000, 6000 manual Connecting the Power Cords

Page 36

2

Bottom panel

Cable

Kick panel

Figure 2-3Routing Cables Under the Kick Panel

2.3Connecting the Power Cords

2.3.1Connecting the Enterprise 6000/5000 System Power Cord

1.Remove the rear screen and the kick panel.

See Section 2.2, “Removing and Replacing the Enterprise 6000/5000 Cabinet Rear Screen and Kick Panel.”

2.Route the AC power cord and external interface cables along the bottom panel of the cabinet and over the edge of the bottom panel.

See Figure 2-3. The cables should be between the bottom panel and the kick panel when you replace the kick panel.

3.Uncoil the AC power cord and plug it into a grounded wall outlet.

The outlet must be a 200-240 VAC 30A circuit, dedicated solely to the server cabinet, as described in the site preparation instructions in Chapter 1.

2-4

Ultra Enterprise 6000/5000/4000 Systems Installation GuideNovember 1996

Image 36
Contents Ultra Enterprise 6000/5000/4000 Systems Installation Guide Please Recycle Contents Cabling the System Using the Software Page Figures Viii Tables Page Unix Commands PrefaceTypographic Conventions Shell PromptsRelated Documents Ordering Sun DocumentsSun Welcomes Your Comments Preface Xvi Preparing for Installation Enterprise 6000/5000 systems 16-slot Unpacking the Enterprise 6000/5000 Cabinet Systems Remove the sides of the containerShipping and Storing the System 2Attaching the Ramps to the Shipping PalletPreparing the Electrical Circuits Enterprise 6000/5000 Cabinet Systems4IEC 309 Electrical Connector Preparing the Air Conditioning Preparing the Ethernet NetworkEnterprise 4000 System 5Types of Network Cables Used Preparing the Area Floorspace for the Enterprise 6000/5000 Cabinet Systems7Cabinet Server Access Areas Top View Surface for the Enterprise 4000 SystemPreparing the Enterprise 6000/5000 Cabinet Systems Moving the ServerAdjusting the Levelling Pads 9Moving the Server Safely Down the RampsLevelling pad 1 Rear screen Kick panel Preparing the Enterprise 4000 System 11Stabilizer BarUsing the User Naming Area Remove the top front bezelPage Cabling the System Preparing the System for CablingStandby position Replacing the Rear Screen and Kick Panel Connecting the Power Cords Connecting the Enterprise 6000/5000 System Power CordConnecting the Enterprise 4000 System Power Cord 4Key Switch PositionsConnecting the Network Cable to the System 5AC Power Switch and Power ReceptacleConnecting the System to the Network 710/100BASE-T Ethernet ConnectionShows the elements used in the installation process Lists the cabling limitations for Ethernet Connecting an Ascii Terminal 10 Clock BoardConnecting the Fiber Cable to the I/O Board Connecting External Scsi Devices Location Internal Length Comments Use tie wraps to secure the cable to the left mounting rail Powering the System On and Off Using JumpStart Automatic InstallationPowering On the System Enterprise 6000/5000 Cabinet SystemsTurn on power to any expansion cabinets 2The AC Power Sequencer Power Switch Turn the key switch to the On position Watch the terminal screen for any firmware error messages Reading Boot Messages 4CPU Reset Switch on the Clock BoardInterpreting Status LED Patterns Summarizes LED status indicationsPowering Off the System Enterprise 4000 System 6Key Switch Positions and AC Power Switch 7CPU Reset Switch on Clock Board Reading Boot Messages DC power green Fault yellow Powering Off the System Description of the Problem Failure of Network CommunicationsSolution Page Using the Software Operating System SoftwareSolstice SyMON Software Page Index Index-1Post Scsi Index-4 Reader Comment Card
Related manuals
Manual 334 pages 12.65 Kb Manual 28 pages 54.7 Kb Manual 204 pages 20.18 Kb