Sun Microsystems 5000 Connecting the Enterprise 4000 System Power Cord, 4Key Switch Positions

Page 37

2

Warning – Risk of electric shock. Do NOT turn on AC power to the unit yet.

4.Continue with Section 2.4 through Section 2.7 for further cabling instructions, and then see Section 2.2 to replace the rear screen and kick panel.

2.3.2Connecting the Enterprise 4000 System Power Cord

1.Insert the key provided with your system into the front panel key switch. Turn it to the Standby position (fully counterclockwise).

See Figure 2-4.

Standby

Figure 2-4Key Switch Positions

2.Turn the AC power switch to Off.

This switch is in the upper left corner of the system rear. See Figure 2-5.

3.Connect the female end of the power cord into the AC connector. This connector is to the left of the AC power switch on the system rear. See Figure 2-5.

4.Connect the male end of the power cord into a grounded wall outlet. The outlet must be a 100-240 VAC 15A circuit.

Cabling the System

2-5

Image 37
Contents Ultra Enterprise 6000/5000/4000 Systems Installation Guide Please Recycle Contents Cabling the System Using the Software Page Figures Viii Tables Page Preface Unix CommandsShell Prompts Typographic ConventionsOrdering Sun Documents Related DocumentsSun Welcomes Your Comments Preface Xvi Preparing for Installation Enterprise 6000/5000 systems 16-slot Remove the sides of the container Unpacking the Enterprise 6000/5000 Cabinet Systems2Attaching the Ramps to the Shipping Pallet Shipping and Storing the SystemEnterprise 6000/5000 Cabinet Systems Preparing the Electrical Circuits4IEC 309 Electrical Connector Preparing the Ethernet Network Preparing the Air ConditioningEnterprise 4000 System 5Types of Network Cables Used Floorspace for the Enterprise 6000/5000 Cabinet Systems Preparing the AreaSurface for the Enterprise 4000 System 7Cabinet Server Access Areas Top ViewMoving the Server Preparing the Enterprise 6000/5000 Cabinet Systems9Moving the Server Safely Down the Ramps Adjusting the Levelling PadsLevelling pad 1 Rear screen Kick panel 11Stabilizer Bar Preparing the Enterprise 4000 SystemRemove the top front bezel Using the User Naming AreaPage Preparing the System for Cabling Cabling the System Standby position Replacing the Rear Screen and Kick Panel Connecting the Enterprise 6000/5000 System Power Cord Connecting the Power Cords4Key Switch Positions Connecting the Enterprise 4000 System Power Cord5AC Power Switch and Power Receptacle Connecting the Network Cable to the System710/100BASE-T Ethernet Connection Connecting the System to the NetworkShows the elements used in the installation process Lists the cabling limitations for Ethernet 10 Clock Board Connecting an Ascii TerminalConnecting the Fiber Cable to the I/O Board Connecting External Scsi Devices Location Internal Length Comments Use tie wraps to secure the cable to the left mounting rail Using JumpStart Automatic Installation Powering the System On and OffEnterprise 6000/5000 Cabinet Systems Powering On the SystemTurn on power to any expansion cabinets 2The AC Power Sequencer Power Switch Turn the key switch to the On position Watch the terminal screen for any firmware error messages 4CPU Reset Switch on the Clock Board Reading Boot MessagesSummarizes LED status indications Interpreting Status LED PatternsPowering Off the System Enterprise 4000 System 6Key Switch Positions and AC Power Switch 7CPU Reset Switch on Clock Board Reading Boot Messages DC power green Fault yellow Powering Off the System Failure of Network Communications Description of the ProblemSolution Page Operating System Software Using the SoftwareSolstice SyMON Software Page Index-1 IndexPost Scsi Index-4 Reader Comment Card
Related manuals
Manual 334 pages 12.65 Kb Manual 28 pages 54.7 Kb Manual 204 pages 20.18 Kb