Paradyne 4300 Have the following equipment ready before beginning this procedure

Page 11
Have the following equipment ready before beginning this procedure:

4300 Remote Broadband Access Concentrator Installation Instructions

Have the following equipment ready before beginning this procedure:

One drill

One 3/4” x 12” drill bit

One 9/16” wrench

Two 15/16” wrenches

One 7/16” wrench

A pencil

Optional pole mounting kit

Follow the sequence below for pole mounting.

1.Pre-assemble the upper and lower horizontal brackets to the vertical bracket as shown in the above Figure.

2.Select a convenient mounting location on the pole.

3.Position the mounting bracket assembly against the pole and mark on the pole the location of the two (2) 5/8 “ bolts (item 18).

4.Place the mounting bracket assembly out of the way.

5.Drill two (2) 3/4” (19 mm) diameter holes completely through the pole at the locations marked in step 2.

6.Insert machine bolt (item 18) through mounting bracket and into the top mounting hole and press bolt and bracket flush against the pole.

7.Place round-cupped washer (item 21), with the concave side in, on bolt and finger tighten nut.

8.Repeat step 6 for remaining bolt.

9.Secure the mounting bracket assembly to the pole by securely tightening the machine bolts to 40 ft-lbs for wooden posts and 100 ft-lbs for metal posts.

10.Using proper lifting and safety equipment, place cabinet on mounting bracket assembly using supplied 3/8” hardware and tighten to 45 ft-lbs. Lifting eyelets are provided on the cabinet for hoisting it in place.

11.If the cable stubs connect to an underground cable, dress the cable down the pole. If the cable stubs connect to an aerial cable, form a drip loop in the cable and dress it up the pole to the splice case.

For mounting heights less than 7’ above grade, excess bolt length may need to cut off in order to prevent a hazardous protrusion.

Lifting eyelets are provided to facilitate hoisting if desired.

4300-A2-GZ40-00

July 2004

11

Image 11
Contents Document Number 4300-A2-GZ40-00 ContentsInstallation Instructions 4300 Remote Broadband Access ConcentratorProduct Documentation Online Using This Installation GuideTrademarks Warranty, Sales, Service, and Training InformationInspecting Shipment Product OverviewConnect Panels Swing out racks for Protection/Cross Connect Panels Figure A - Front view of cabinet with door openRectifier or DC-DC Converter Cabinet lifting eyelets GranDSLAM DSLAMs Protection/CrossFigure B - Front view of cabinet without equipment CABINET CONFIGURATIONSTable 1 - Expansion, Mounting and Maintenance Kits EXPANSION, MOUNTING AND MAINTENANCE KITSFigure C - Cabinet overall dimensions PRODUCT SPECIFICATIONSFigure D - Quarter turn locking door latches QUARTER-TURN LOCKING DOOR LATCHESLifting eyelets are provided to facilitate hoisting if desired Installation ProcedureCLEARANCE REQUIREMENTS Figure E - Cabinet FootprintFigure F - Pole Mounting Diagram INSTALLATION PROCEDURE FOR POLE MOUNTINGHave the following equipment ready before beginning this procedure Figure G - Wall Mounting Diagram INSTALLATION PROCEDURE FOR WALL MOUNTINGLifting eyelets are provided to facilitate hoisting if desired Cabinet Grounding Information GROUND WIREFigure H - Grounding Diagram GROUNDING DIAGRAM AND PROCEDUREunterminated Protection/Cross ConnectsFigure I - Protection/Cross Connect Panel, top view 50 pair Figure J -Cross Connect Panel, front viewConnector POTS Protection/Cross Connect Wiring TablesTable 2 - Protection Cross Connect Cable Wiring Connector DSLWHITE / BROWN Table 3 - Cross Connect Panel WiringWHITE / ORANGE WHITE / BLUEFilter Maintenance Fan/Filter ReplacementFigure K - Fan/Filter Replacement Diagram Figure L - Model 1 Schematic Wiring Diagram EXTERNAL WIRINGLINE POWER SCHEMATIC WIRING DIAGRAMSFigure M - Model 2 Schematic Wiring Diagram 4300-A2-GZ40-00 Figure N - Model 3 Schematic Wiring Diagram