TP-Link TL-SG2452, TL-SG2424, Tl-SB2216 manual Installation Tools, Lightning Protection

Page 13

Gigabit Smart Switch

Lightning Protection

Extremely high voltage currents can be produced instantly when lightning occurs and the air in the electric discharge path can be instantly heated up to 20,000. As this instant current is strong enough to damage electronic devices, more effective lightning protection measures should be taken.

Ensure the rack and device are well earthed.

Make sure the power socket has a good contact with the ground. Keep a reasonable cabling system and avoid induced lightning. Use the signal SPD (Surge Protective Device\ when wiring outdoor.

Note: For detailed lightning protection measures, please refer to Chapter 3 Lightning Protection.

Installation Site

S

When installing the device on a rack or a flat workbench, please note the following items:

The rack or workbench is flat and stable, and sturdy enough to support the weight of 5.5kg at least.

The rack or workbench has a good ventilation system. The equipment room is well ventilated.

The rack is well grounded. Keep the power socket less than 1.5 meters away from the device.

2222 Installation Tools

Phillips screwdriver ESD-preventive wrist wrap Cables

Note: These tools are not provided with our product. If needed, please self purchase them.

Installation 09

Image 13
Contents Installation Guide CE Mark Warning Copyright & Trademarks FCC StatementAudience Related Document About this Installation GuideConventions Contents Product Overview Cccccccccc IntroductionAppearance Front PanelReset Front panel of TL-SG2424P is shown as the following figure LED Mode Switch Button Rear Panel Grounding Terminal Package Contents CCCCCCCCCCInstallationSafety Precautions Site Requirements Temperature/HumidityLightning Protection Installation ToolsDesktop Installation Product InstallationRack Installation Fffffffffff Rack Installation Cabling Reasonably Cccccccccc Lightning ProtectionRequirements for Cabling Outdoors Requirements for Cabling Indoors Connect to Ground Connecting to the Grounding BarEquipotential Bonding Connecting to the Ground via the Power SupplyUse Lightning Arrester Fffffffffff Lighting Arrester Connection Ethernet Port CCCCCCCCCCConnectionSFP Port Power On Verify InstallationInitialization Configure the Switch via GUI CCCCCCCCCCConfigurationConfigure the Switch Using CLI Can be made by using CLI Qqqq Why does the Power LED work abnormally? Appendix a TroubleshootingAppendix B Hardware Specifications Appendix C Technical Support Technical Support Page Mail support@tp-link.com 7106504146 Rev
Related manuals
Manual 28 pages 6.79 Kb