TP-Link TL-SG2424, TL-SG2452, Tl-SB2216 manual Technical Support

Page 30

Gigabit Smart Switch

 

 

 

 

 

 

Germany/Austria

Tel: +49 1805 875 465 (German Service\

 

 

+49 1805 TPLINK

 

 

+43

820 820 360

 

 

E-mail: support.de@tp-link.com

 

 

Fee: 0.14 EUR/min from the German fixed phone

 

 

network and up to 0.42 EUR/min from mobile phone

 

 

Service time: Monday to Friday, 09:00 to 12:30 and

 

 

13:30 to 17:30. GMT+ 1 or GMT+ 2 (Daylight Saving

 

 

Time in Germany\

 

 

*Except bank holidays in Hesse

 

Switzerland

Tel: +41 (0\ 848 800 998 (German Service\

 

 

E-mail: support.ch@tp-link.com

 

 

Fee: 4-8 Rp/min, depending on rate of different time

 

 

Service time: Monday to Friday, 09:00 to 12:30 and

 

 

13:30 to 17:30. GMT+ 1 or GMT+ 2 (Daylight Saving

 

 

Time\

 

 

Russian Federation

Tel: 8 (499\ 754 5560

 

 

8 (800\ 250 5560 (toll-free call from any RF region\

 

 

E-mail: support.ru@tp-link.com

 

 

Service time: From 10:00 to 18:00 (Moscow time\

 

 

*Except weekends and holidays in Russian Federation

 

 

 

 

Ukraine

Tel: 0800 505 508

 

 

E-mail: support.ua@tp-link.com

 

 

Service time: Monday to Friday 10:00 to 22:00

 

Brazil

Toll Free: 0800 608 9799 (Portuguese Service\

 

 

E-mail: suporte.br@tp-link.com

 

 

Service time: Monday to Friday, 09:00 to 20:00;

 

 

Saturday, 09:00 to 15:00

 

Poland

Tel: +48 (0\ 801 080 618

+48 227 217 563 (if calls from mobile phone\ E-mail: support.pl@tp-link.com

Service time: Monday to Friday 09:00 to 17:00. GMT+1 or GMT+2 (Daylight Saving Time\

26 Technical Support

Image 30
Contents Installation Guide Copyright & Trademarks FCC Statement CE Mark WarningRelated Document About this Installation Guide AudienceConventions Contents Appearance Cccccccccc IntroductionProduct Overview Front PanelReset Front panel of TL-SG2424P is shown as the following figure LED Mode Switch Button Rear Panel Grounding Terminal CCCCCCCCCCInstallation Package ContentsSafety Precautions Temperature/Humidity Site RequirementsInstallation Tools Lightning ProtectionProduct Installation Desktop InstallationRack Installation Fffffffffff Rack Installation Cccccccccc Lightning Protection Cabling ReasonablyRequirements for Cabling Outdoors Requirements for Cabling Indoors Connecting to the Grounding Bar Connect to GroundConnecting to the Ground via the Power Supply Equipotential BondingUse Lightning Arrester Fffffffffff Lighting Arrester Connection CCCCCCCCCCConnection Ethernet PortSFP Port Verify Installation Power OnInitialization CCCCCCCCCCConfiguration Configure the Switch via GUIConfigure the Switch Using CLI Can be made by using CLI Appendix a Troubleshooting Qqqq Why does the Power LED work abnormally?Appendix B Hardware Specifications Appendix C Technical Support Technical Support Page Mail support@tp-link.com 7106504146 Rev
Related manuals
Manual 28 pages 6.79 Kb