LG Electronics setup guide Typical PCS150R Rack Installation

Page 9

Rack Installation

Typical PCS150R Rack Installation

1.Carefully slide the chassis into a standard 19-inch equipment rack.

2.Use all four mounting screws to secure the chassis to the rack.

Rack-mount Considerations

A. Elevated Operating Ambient

If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer (see Specifications information in this document).

B. Reduced Air Flow

Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised. To ventilate the system nor- mally and avoid overheating, leave at least 1 inch (2.5 cm) on each side (including top and bottom) of the PCS150R. Do NOT stack other equipment on the top of the PCS150R unit.

C. Circuit Overloading

Consideration should be given to the con- nection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring.

D. Reliable Earthing

Maintain reliable earthing of rack-mounted equipment. Particular attention should be given to supply connections other than direct connections to the branch circuit (e.g. use of power strips).

E.Mains Outlet Earthing

The apparatus with Class I construction must be connected to a mains socket outlet with a protective earthing connection.

206-4157

9

Image 9
Contents Copyright 2011, LG Electronics U.S.A., Inc 206-4157 Rev aFor Customer Support/Service, please call­1-888-865-3026 Important Safety Instructions Safety Check Damage Requiring ServicePCS150R Rack Installation also see Rack-mount Considerations Elevated Operating AmbientReduced Air Flow PCS150R Installation on a Flat SurfaceCircuit Overloading Reliable EarthingTable of Contents / Setup Checklist PCS150R Product Description FeaturesRear and Front Panel Overviews PCS150R Rear ViewPCS150R Front View Typical PCS150R Rack Installation Rack InstallationTypical Setup Flow Charts for the PCS150R System SetupASI Output RF OutputVPN Network Connections Overview Typical System InstallationProCentric VPN Server Internet VPN ClientFrom previous PCS150R Configuration Options Network and Communication OptionsLog In to the PCS150R Main Menu System information Info Video View System InformationConfigure Video Parameters Configure the TCP/IP Settings Configuring DNS Do you want to save the new configuration? Y/N New configuration has been saved. Please restart the systemSet the Time Zone Please select a country Time zone has been set. Please reset the boardPlease select one of the following time zone regions Universal Time is now Tue May 222310Update PCS150R Application or OS Software via Ethernet Change the Login PasswordUpdate PCS150R Application or OS Software via Serial Link Update the VPN SetupSend VPN client file using Xmodem Logout Reset the PCS150RTroubleshooting / Specifications TroubleshootingSpecifications Document Revision History / Notes Document Revision HistoryDate Description May Revision a New document Open Source Software Notice LG PCS150R ProCentric Server Warranty