MITSUBISHI | 2033C SERIES UPS | Page Number: |
ELECTRIC | OWNERS / TECHNICAL MANUAL |
DATE & CLOCK SETUP SCREEN
Pressing the lower right of the MAIN MENU Screen will display the date & clock setup screen. On Pressing the END Touch Icon, the display returns to the MAIN MENU Screen.
FIGURE 2.5 DATE & CLOCK SETUP Screens
| 【現在時刻】 |
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
| ||||
| 【 | SET | CLOCK | 】 |
|
|
|
|
| END |
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| 終了 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 /1 / 2000 |
|
|
| 12 : 00 : 00 |
|
|
| ||||||
2000年 | 1月 | 1日 | 12時 |
| 分 | 00秒 |
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
| 6 | 7 |
| 8 |
|
| 9 |
| - | ▲ |
| CLR | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
| 1 | 2 |
| 3 |
|
| 4 |
|
| ▼ |
| ENT | ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pressing the each point can set the date or clock.
NOTE: The display measurement values shown for LCD Monitor Displays are samples only.
2)Load on inverter [INV OP.] (green)
Illuminated when power is supplied from inverter to the critical load.
3)Battery operation [BAT OP.] (yellow)
Illuminated when the battery is operating following an AC power failure.
4)Load on bypass [BYP OP.] (yellow)
Illuminated when power is supplied to load devices by static bypass.
5)UPS failure [FAILURE] (red) Illuminated when UPS is in fault mode.
6)Inverter start [START] (green) Inverter start button.
When pressed, the load will transfer from the static bypass line to the inverter.
7)Inverter stop [STOP] (gray)
Inverter stop button. When pressed, the inverter can be stopped. The load will transfer from the inverter to the static bypass line.
8)Alarm Silence [SILENCE] (gray)
Audible alarm is silenced when this button is pressed.
9)Clear [CLEAR] (gray)
Clears errors in UPS system.
10)Emergency Power Off [EPO] (red)
Shuts down UPS when pressed. Load is dropped.
11)Load on maintenance bypass [MBP] (red)
Illuminated when power is supplied to load devices by maintenance bypass.