Default Configuration
Figure 1-1. EZ-KIT Lite Hardware Setup
3.Plug the provided power supply into J7 on the EZ-KIT Lite board. Visually verify that the green power LED (LED10) is on. Also verify that the red reset LED (LED9) goes on for a moment and then goes off, and, finally, LED1 through LED8 are blinking sequentially.
4.Connect one end of the USB cable to an available full speed USB port on your PC and the other end to ZJ1 on the ADSP-21364 EZ-KIT Lite board.
1-4 | ADSP-21364 EZ-KIT Lite Evaluation System Manual |