Alcatel-Lucent 6850-48L, 6850-P48X, 6850-P48L manual Rack-Mounting the Switch, Rack Mounting Steps

Page 12

Rack-Mounting the Switch

Refer to the important guidelines below before installing the OmniSwitch chassis in a rack.

It is recommended that two people install the switch in the rack—one person to hold the chassis and position it in the rack, and a second person to secure the chassis to the rack using attachment screws (not supplied).

Alcatel-Lucent provides two rack-mount flanges with each OmniSwitch 6850 Series switch. These flanges support standard 19-inch rack mount installations.

These flanges must be attached to the chassis before the switch can be rack mounted.

Note. If you are installing the switch in a 23-inch wide rack, Alcatel-Lucent offers optional 23-inch rack-mount- ing hardware. For more information, contact your Alcatel- Lucent representative.

Alcatel-Lucent does not provide rack-mount screws. Use the screws supplied by the rack vendor.

To prevent a rack from becoming top heavy, it is recommended that you install heavier equipment at the bottom of the rack whenever possible.

If you are installing the switch in a relay rack, be sure to install and secure the rack as per the rack manufac- turer’s specifications.

Review page 6 for important chassis airflow and access recommendations before installing.

Rack Mounting Steps

To rack-mount the switch, follow the steps below:

Note. Rack-mount flanges may come factory-installed in some cases. If this is the case, skip steps 1 and 2 below.

1Align the holes in the provided rack-mount flanges with the four threaded holes in the OmniSwitch chassis. These threaded holes are located in the left and right sides of the chassis, near the front panel.

2Attach the flanges to the chassis using the provided Phillips-head screws. Be sure to tighten each of the screws firmly using a Phillips screwdriver.

45

46

Attaching a Rack-Mount Flange

8 Installing the Hardware

June 2007

Image 12
Contents OmniSwitch 6850 Series Patent No ,542,507 Table of Contents June OmniSwitch 6850 Series Related Documentation Installing the Hardware Items RequiredSite Preparation Weight Considerations Unpacking and Initial Setup Items Included Unpacking the Chassis RecommendationsSetting Up the Switch Airflow ConsiderationsInstallation Options Installing the Switch on a Tabletop or BenchTabletop Mounting Steps Rack-Mounting the Switch Rack Mounting StepsAttaching the Switch to the Rack Installing Combo Port SFPs Installing Backup Power Supply ComponentsSerial Connection Default Settings Connecting the Serial CableConnections and Cabling Booting OmniSwitch 6850 Series Switches Booting a Standalone SwitchJune Your First Login Session Logging in to the SwitchAssigning an IP Address to the Switch Unlocking Session Types Unlocking All Session TypesUnlocking Specified Session Types Changing the Login Password Setting the System Time Zone Setting the Date and TimeSetting Optional System Information Specifying an Administrative ContactSpecifying the Switch’s Location Viewing and Saving ChangesSpecifying a System Name Boot.params File Boot.cfg FileFiles and Directories Image Files Working and Certified Directories Working DirectoryCertified Directory Certified DirectoryWhat happens when the switch boots? Can I save changes to the Certified directory?Working and Certified Are Identical Working and Certified Are Different Working DirectoryUsing WebView Logging In to WebViewBrowser Compatibility Navigating WebView Main Configuration Group Toolbar Online Help Additional InformationTroubleshooting Login screen displays, but the login fails