Alcatel-Lucent 6300-24 manual Port Status LEDs, Condition Status

Page 19

Description of Hardware 1

Status LEDs

The LEDs, which are located on the front panel for easy viewing, are shown below and described in the following table.

Link/Act

BPS

SFP LEDs

 

 

FDX

 

 

Figure 1-2. Port LEDs

 

Table 1-1. Port Status LEDs

 

 

 

 

 

 

 

Port Status LEDs

 

 

 

 

LED

Condition

 

Status

 

 

 

 

RJ-45 Ports

 

 

 

 

 

 

 

Link/Act.

On Green

 

Communications have been set to 1000 Mbps.

 

 

 

 

 

On Yellow

 

Communications have been set to 10/100 Mbps.

 

 

 

 

 

Flashing Green

 

Traffic is passing through the port at 1000 Mbps.

 

 

 

 

 

Flashing Yellow

 

Traffic is passing through the port at 10/100 Mbps.

 

 

 

 

FDX

Green

 

Communications have been set to full duplex.

 

 

 

 

 

Off

 

Communications have been set to half duplex.

 

 

 

 

SFP Transceiver

Slots

 

 

 

 

 

 

(Ports 21-24)

On Green

 

An SFP transceiver port has established a valid 1000 Mbps

 

 

 

network connection. The associated RJ-45 port is disabled.

 

Off

 

An SFP transceiver port has no valid link, or the link has

 

 

 

failed. The associated RJ-45 port is enabled.

1-3

Image 19
Contents Part No -10, Rev. a December OmniStackPage Page Page Compliances and Safety Warnings Industry Canada Class B Vii Safety ComplianceUnderwriters Laboratories Compliance Statement Warnhinweis Faseroptikanschlüsse Optische SicherheitViii Wichtige Sicherheitshinweise GermanyDocumentation Environmental StatementEnd of Product Life Span Manufacturing MaterialsRelated Publications PurposeContents Glossary Index Appendix a TroubleshootingAppendix C Specifications Appendix B CablesTables Tables Xii Figures Figures Xiv Network Management Options Switch ArchitectureIntroduction OverviewIntroduction Description of Hardware10/100/1000BASE-T Ports SFP SlotsPort Status LEDs Status LEDsCondition Status System LEDs System Status LEDs Power Supply Receptacles Optional Backup Power SupplyFeatures and Benefits Management Network Planning Introduction to SwitchingCollapsed Backbone Application ExamplesNetwork Planning Network Aggregation Plan Network Aggregation PlanRemote Connection with Fiber Cable Remote Connection with Fiber CableMaking Vlan Connections Making Vlan ConnectionsApplication Notes Selecting a Site Installing the SwitchEthernet Cabling Package Contents Equipment ChecklistOptional Rack-Mounting Equipment To rack-mount devices MountingRack Mounting MountingDesktop or Shelf Mounting Installing the Switch in a RackInstalling an Optional SFP Transceiver into the Switch Connecting to a Power SourcePower Receptacle Connecting to the Console PortSerial Cable Wiring Switch’s 9-Pin Null Modem PC’s 9-Pin Wiring Map for Serial CableDTE Port Installing the Switch Twisted-Pair Devices Connecting to PCs, Servers, Hubs and SwitchesConnecting Network Devices Making Network ConnectionsMaking Network Connections Network Wiring ConnectionsMaking LC Port Connections Fiber Optic SFP DevicesMbps Gigabit Ethernet Collision Domain ConnectorConnectivity Rules 1000BASE-T Cable RequirementsMbps Ethernet Collision Domain Mbps Fast Ethernet Collision Domain100 m 328 ft RJ-45 Cable Labeling and Connection Records Installation Appendix a TroubleshootingDiagnosing Switch Indicators Power and Cooling ProblemsTroubleshooting Twisted-Pair Cable and Pin Assignments Appendix B Cables10BASE-T/100BASE-TX Pin Assignments Cables 1000BASE-T Pin AssignmentsFiber Standards B Fiber StandardsCables Physical Characteristics Appendix C SpecificationsCompliances SpecificationsCE Mark Glossary-1 GlossaryGlossary-2 GlossaryGlossary-3 LEDGlossary Glossary-4 Index-1 IndexIndex-2 IndexPage 060190-10