Alcatel-Lucent 6300-24 Equipment Checklist, Package Contents, Optional Rack-Mounting Equipment

Page 30

3 Installing the Switch

RJ-45 Connector

Figure 3-1. RJ-45 Connections

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.

Package Contents

Gigabit Ethernet Switch

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch

Power Cord—either US, Continental Europe or UK

RS-232 console cable

This Getting Started Guide

User Guide

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

3-2

Image 30
Contents OmniStack Part No -10, Rev. a DecemberPage Page Page Compliances and Safety Warnings Industry Canada Class B Warnhinweis Faseroptikanschlüsse Optische Sicherheit Safety ComplianceUnderwriters Laboratories Compliance Statement ViiWichtige Sicherheitshinweise Germany ViiiManufacturing Materials Environmental StatementEnd of Product Life Span DocumentationPurpose Related PublicationsContents Appendix B Cables Appendix a TroubleshootingAppendix C Specifications Glossary IndexTables Tables Xii Figures Figures Xiv Overview Switch ArchitectureIntroduction Network Management OptionsSFP Slots Description of Hardware10/100/1000BASE-T Ports IntroductionStatus LEDs Port Status LEDsCondition Status System LEDs System Status LEDs Optional Backup Power Supply Power Supply ReceptaclesFeatures and Benefits Management Introduction to Switching Network PlanningApplication Examples Collapsed BackboneNetwork Planning Network Aggregation Plan Network Aggregation PlanRemote Connection with Fiber Cable Remote Connection with Fiber CableMaking Vlan Connections Making Vlan ConnectionsApplication Notes Installing the Switch Selecting a SiteEthernet Cabling Equipment Checklist Package ContentsOptional Rack-Mounting Equipment Mounting MountingRack Mounting To rack-mount devicesInstalling the Switch in a Rack Desktop or Shelf MountingConnecting to a Power Source Installing an Optional SFP Transceiver into the SwitchConnecting to the Console Port Power ReceptacleWiring Map for Serial Cable Serial Cable Wiring Switch’s 9-Pin Null Modem PC’s 9-PinDTE Port Installing the Switch Making Network Connections Connecting to PCs, Servers, Hubs and SwitchesConnecting Network Devices Twisted-Pair DevicesNetwork Wiring Connections Making Network ConnectionsFiber Optic SFP Devices Making LC Port Connections1000BASE-T Cable Requirements ConnectorConnectivity Rules Mbps Gigabit Ethernet Collision DomainMbps Fast Ethernet Collision Domain Mbps Ethernet Collision Domain100 m 328 ft RJ-45 Cable Labeling and Connection Records Power and Cooling Problems Appendix a TroubleshootingDiagnosing Switch Indicators InstallationTroubleshooting Appendix B Cables Twisted-Pair Cable and Pin Assignments10BASE-T/100BASE-TX Pin Assignments 1000BASE-T Pin Assignments CablesFiber Standards Fiber Standards BCables Appendix C Specifications Physical CharacteristicsSpecifications CompliancesCE Mark Glossary Glossary-1Glossary Glossary-2LED Glossary-3Glossary Glossary-4 Index Index-1Index Index-2Page 060190-10