Installing cards in an expansion chassis
Install the
•Install each card, starting with the lowest priority (see “Before you start” on page 18) in the
•If you are installing a Network Management Card, install it in slot 3, even if you are leaving another slot empty.
Installing cards in expansion chassis set up serially
If you have increased your management card capacity by connecting multiple expansion chassis serially (in a cascading setup), install the Network Management Card in the
Warning: Do not attach more than two Network Management Cards or one Building Management Integration Card to a UPS.
If the Network Management Card is
Installing cards in a Symmetra UPS
If you are installing a Network Management Card without an attached expansion chassis, install that card in the highest numbered slot, even if you are leaving other slots empty. If you are using an expansion chassis, see “Installing cards in an expansion chassis” on page 19.
Installation Manual | 19 |