3Com S21x installation manual Power Up, Sequence, Stage When This indicates

Page 38

Powerup Diagnostics

Power Up

When the PathBuilder S21x switch power cord is plugged into the power supply

Sequence

outlet, you will see the following powerup sequence:

 

 

 

 

 

Stage

when...

...this indicates

 

 

 

 

 

1

POWER (GREEN) lights

PathBuilder S200 series switch is

 

 

turns on.

receiving power.

 

 

 

 

 

2

TEST (GREEN) comes on

Diagnostics executes for 30 seconds.

 

 

and blinks five times

 

 

 

 

 

 

3

STATUS (GREEN) comes on

Indicates software is being downloaded

 

 

and blinks at slow rate.

from FLASH.

 

 

TEST/WATCHDOG

 

 

 

(ORANGE) light also remain

 

 

 

on.

 

 

 

 

 

 

4

STATUS (GREEN) light

Software is initializing your system

 

 

stays off for up to 10 seconds,

configuration.

 

 

then turns green.

 

 

 

 

 

Hardware Failure If the TEST light turns on and remains on, one or more of the diagnostic tests have failed, indicating there is a hardware problem. Contact 3Com for possible repairs to your PathBuilder S21x switch.

Diagnostic Failure If the TEST light does not blink at all, but the Status light is on, the diagnostic software image is corrupted. Perform a download of the software option bundle.

Powerup Failure If the STATUS light blinks continuously, at a constant rate, the software bundle in Flash memory is corrupted. Perform a cold load of the software option bundle. See the Software Installation and Coldloading Manual (Part No. T0028) for more information.

3-4

Powering on the PathBuilder S21x Switch

Image 38
Contents 3Com Corporation Restricted Rights Notification for U.S. Government Users Restricted Rights LegendProprietary Material Page About This Manual OverviewTrademarks Product Company/OrganizationAbout This Manual How to Use This Manual This section Describes ChapterDescriptions Documentation Related DocumentationOther PathBuilder S200Page Contents Contents Chapter CTP Port FeaturesStandard Features Dual DaughtercardDual FXS Voice Voice RelayDaughtercard RelayDIM Site RFC 877 ServiceFrame Relay RFCTarget Application Environments Security Monitoring Central Office At Branch Office Target Application Environments Installing the PathBuilder S21x Switch Hardware Overview Step To Perform This Action See This ProcedureChecking Your Shipment Contents Choosing a Site Proper Cable and Air Clearance Cabling the PathBuilder S21x Switch Port Port Characteristics Cable RequirementsPort Connector Interface Cable Required Speed DIM Interface Connector 10BaseT Ethernet CableSwitch Setting Front Panel Dip SwitchesSwitches Switch Down Posn NameDaughtercards Installing Optional DaughtercardsOptional Battery Disposal Installing or Removing the Lithium BatteryBattery Type Routine BatteryCoversteps Step ActionInstalling Battery Removing Powering on the PathBuilder S21x Switch Overview This chapter describesPowering On The PathBuilder S21x Switch SwitchPowerup Diagnostics Panel LEDsSequence Power UpStage When This indicates Accessing the Control Terminal Port Page Software SpecificationsHardware Environmental Electromagnetic CompatibilitySafety Power RequirementsPower Supply DescriptionAppendix B RJ45 Pin Signal Pin Connection On DB25F Adapter CTP Access CableCTP Cable Connector Pinout Pin SpecificationVoice Relay Cable Name FunctionDual FXS Voice Relay Cable FXS10BaseT Crossover Cable Figure B-1. RJ45 PinoutPin Function Camera Interface Connector PinoutRemoteVu Video Cables Cable Pinout Pin Signal FunctionDSU Daughtercard Cable 35/V.36 DCE Pin Function/Signal Name35/V.36 Cable 35/V.36 DTE Cable Pin Function/Signal Name TXD TXD RXD RTS CTS DSR Cable Appendix C This AppendixConnection While Setting Up Your ConfigurationChecking Must be set to Step Action Technical Support Access by Analog Modem Country Data Rate Telephone NumberCountry Telephone Number Support from3Com Returning Country Telephone Number Fax NumberIndex NumericsURL